My WebLink
|
Help
|
About
|
Sign Out
Home
10E Consent
CityHall
>
City Clerk
>
City Council
>
Agenda Packets
>
2023
>
Packet 20230417
>
10E Consent
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/6/2025 10:10:37 AM
Creation date
5/31/2023 11:56:52 AM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Staff Report
Document Date (6)
4/17/2023
Retention
PERM
Document Relationships
Reso 23-039 SS Point Repair 2022
(Amended)
Path:
\City Clerk\City Council\Resolutions\2023
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of San Leandro <br />City Council <br />Meeting Date: April 17, 2023 <br />Agenda Number: 10.e. <br />Agenda Section: CONSENT CALENDAR <br />File Number: 23-091 <br />File Type: Staff Report <br />Adopt a Resolution Rejecting All Bids for the Sanitary Sewer Point Repairs 2022 Project, Project No. <br />2022.0120 <br />COUNCIL PRIORITY <br />·Public Safety <br />·Infrastructure <br />SUMMARY <br />This project provides for construction of sanitary sewer line repairs at various locations within the <br />San Leandro sewer service area. Four bids were received for construction. None of the bidders <br />have an office in San Leandro that would qualify them as a local business per the Local Inclusion <br />Policy Ordinance. None of the bidders met the Local Business Participation Goal by <br />subcontracting with San Leandro businesses for 25% of the contract value, and none of the <br />bidders provided documentation that demonstrated completion of the required good faith efforts <br />to meet the local business participation goal. <br />RECOMMENDATIONS <br />Staff recommends rejecting all bids from the February 28, 2023 bid opening for the subject <br />project, and rebidding the project at a later date. <br />BACKGROUND <br />City staff routinely inspects the condition of the sanitary sewer main lines and manholes in the <br />City’s service area. The sanitary sewer point repair project is based upon inspections that have <br />identified locations of defects or deteriorated facilities to the point that repairs are needed or may <br />be needed soon. Locations that require a significant amount of repetitive maintenance by Public <br />Works, if within the proximity of a repair project, are also included in the scope of work. <br /> <br />This project will repair and replace defective sanitary sewer main lines, rehabilitate, upgrade, and <br />reconstruct deteriorated manholes, and replace undersized access structures with full-sized <br />standard manholes. These improvements, when completed, will increase the system’s reliability, <br />reduce the frequency of required maintenance, improve the efficiency of maintenance operations, <br />and reduce the risk of sewage overflows. Existing improvements disturbed by the construction <br />will be restored at the end of the Project. <br />A total of four bids were received on February 28, 2023, ranging between $1,084,275 and <br />$2,089,497. The pre-bid engineer’s estimate for construction was $1,036,063. All the bids were <br />Page 1 City of San Leandro Printed on 5/3/2023
The URL can be used to link to this page
Your browser does not support the video tag.