My WebLink
|
Help
|
About
|
Sign Out
Home
5B Consent
CityHall
>
City Clerk
>
City Council
>
Agenda Packets
>
2025
>
Packet 20250121
>
5B Consent
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/22/2025 9:59:13 AM
Creation date
9/8/2025 3:37:37 PM
Metadata
Fields
Template:
CM City Clerk-City Council
Document Date (6)
1/21/2025
Retention
Perm
Document Relationships
Reso 2025-006 Police Building Project Appropriation
(Amended)
Path:
\City Clerk\City Council\Resolutions\2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of San Leandro <br />City Council <br />Meeting Date: January 21, 2025 <br />Agenda Number: 5.b. <br />Agenda Section: CONSENT CALENDAR <br />File Number: 24-316 <br />File Type: Staff Report <br />Adopt a Resolution to Appropriate $1,450,000 from General Fund Reserves to the Police Building and South <br />Offices Modifications Project, Project No. 2014.0481 <br />COUNCIL PRIORITY <br />·Public Safety <br />·Infrastructure <br />SUMMARY <br />This action appropriates $1,450,000 from General Fund Reserves to the Police Building and South <br />Offices Modifications project to cover project costs through completion of the work. <br />RECOMMENDATIONS <br />Staff recommends the appropriation of $1,450,000 from General Fund Reserves to the subject project <br />in account 210-18-137. <br />BACKGROUND <br />The project involved remodeling both the South Offices Building and the San Leandro Police Building. <br />Construction of this project was scheduled for completion in Summer 2020 but was not substantially <br />complete until June 2024; a delay of 46 months. <br />In September of 2022 staff anticipated that the work would be completed at the end of 2022, a delay of <br />33 months, and the City Council authorized additional funding for the project to cover this extended <br />construction period. Subsequently, additional delays were encountered including a delay of 6 additional <br />months to obtain PG&E service, delays in making the new uninterrupted power source operational, and <br />delays in construction of various contract and extra work items. <br />The construction work by the general contractor, DL Falk Construction, Inc. is now complete. <br />Analysis <br />The project budget is currently $11,134,983. Additional funding is required to complete the project as <br />described herein. <br />Description Amount <br />Staff and consultant costs for extended duration of work $622,000 <br />Construction costs in excess of budget $828,000 <br />Total Required $1,450,000 <br /> <br />Page 1 City of San Leandro Printed on 9/4/2025
The URL can be used to link to this page
Your browser does not support the video tag.