Laserfiche WebLink
<br /> <br />EXHIBIT A-3 <br />LEED CREDITS <br /> <br />Sustainable Sites <br /> <br />? <br /> <br />Prereq 1 <br />Credit 1 <br />Credit 2 <br />Credit 3 <br />Credit 4.1 <br />Credit 4.2 <br />Credit 4.3 <br />Credit 4.4 <br />Credit 5.1 <br />Credit 5.2 <br />Credit 6.1 <br />Credit 6.2 <br />Credit 7.1 <br />Credit 7.2 <br />Credit 8 <br /> <br />Erosion & Sedimentation Control <br />Site Selection <br />Development Density <br />Brownfield Redevelopment <br />Alternative Transportation, Public Transportation Access <br />Alternative Transportation, Bicycle Storage & Changing Rooms <br />Alternative Transportation, Alternative Fuel Refueling Stations <br />Alternative Transportation, Parking Capacity <br />Reduced Site Disturbance, Protect or Restore Open Space <br />Reduced Site Disturbance, Development Footprint <br />Stormwater Management, Rate or Quantity <br />Stormwater Management, Treatment <br />Landscape & Exterior Design to Reduce Heat Islands, Non~Roof <br />Landscape & Exterior Design to Reduce Heat Islands, Roof <br />Light Pollution Reduction <br /> <br /> <br />Yes ? No <br />14--rI:::r:::j- <br /> <br />Credit 1.1 <br />Credit 1.2 <br />Credit 2 <br />Credit 3.1 <br />Credit 3.2 <br /> <br />Water Efficient Landscaping, Reduce by 50% <br />Water Efficient Landscaping, No Potable Use or No Irrigation <br />Innovative Wastewater Technologies <br />Water Use Reduction, 20% Reduction <br />Water Use Reduction, 30% Reduction <br /> <br />- Ener & Atmosphere <br /> <br /> <br />Senior Center <br />Project No. 210-18-116 <br />COBG - Rev. 3/15/04 <br /> <br />Prereq 1 <br />Prereq 2 <br />Prereq 3 <br />Credit 1.1 <br />Credit 1.2 <br />Credit 1.3 <br />Credit 1 .4 <br />Credit 1.5 <br />Credit 1.6 <br />Credit 2.1 <br />Credit 2.2 <br />Credit 2.3 <br />Credit 3 <br />Credit 4 <br />Credit 5 <br />Credit 6 <br /> <br />Fundamental Building Systems Commissioning <br />Minimum Energy Performance <br />CFC Reduction in HVAC&R Equipment <br />Optimize Energy Performance, 2.50% <T24 2001 baseline <br />Optimize Energy Performance, 7.51 % <T24 2001 baseline <br />Optimize Energy Performance, 12.51% <T24 2001 baseline <br />Optimize Energy Performance, 17.51% <T24 2001 baseline <br />Optimize Energy Performance, 22.51 % <T24 2001 baseline <br />Optimize Energy Performance, 27.51% <T24 2001 baseline <br />Renewable Energy, 5% <br />Renewable Energy, 10% <br />Renewable Energy, 20% <br />Additional Commissioning <br />Ozone Depletion <br />Measurement & Verification <br />Green Power <br /> <br />2/6/06 <br />Page 26 of39 <br />