My WebLink
|
Help
|
About
|
Sign Out
Home
8E Consent 2006 1120
CityHall
>
City Clerk
>
City Council
>
Agenda Packets
>
2006
>
Packet 2006 1120
>
8E Consent 2006 1120
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/10/2007 11:36:18 AM
Creation date
11/17/2006 3:05:20 PM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Staff Report
Document Date (6)
11/20/2006
Retention
PERM
Document Relationships
_CC Agenda 2006 1120
(Reference)
Path:
\City Clerk\City Council\Agenda Packets\2006\Packet 2006 1120
Reso 2006-126
(Reference)
Path:
\City Clerk\City Council\Resolutions\2006
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
28
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Additional Services <br />ill addition to the above services, Harris Design would be pleased to provide Additional Services that are <br />requested by the City. Labor and reimbursable expenses for services in addition to those described above, <br />shall be compensated in accordance with Harris Design's Standard Fee and Reimbursement Schedule for <br />the actual hours worked and costs incurred by Harris Design. <br /> <br />Assumptions / City Responsibilities <br />. , All work billed on an hourly basis shall be pre.approved by the City prior to proceeding. <br />. Software compatibility: All deliverables will be provided in both electronic and hard copy format. <br />Electronic files shall be in Microsoft Project, word, or excel file format and provided on CD. <br />ROM. Drawings shall be in Autocad 2006 format. <br />. All deliverables, reports, drawings, estimate shall become the property ofthe City of San Leandro <br />. The information, surveys, documents and all other services furnished by the City and the City's <br />consultants and contractors shall be provided to Harris Design at the City's expense. <br />. The City will provide services of a soils engineer or other consultants when such services are <br />reasonably necessary or required by the governing agency, including reports, test borings, test <br />pits, percolation tests and any other necessary operations for determining subsoil, with <br />appropriate professional interpretation thereof. <br />. The City will prepare' front-end' standard provisions for the construction contract. <br />. The City will receive construction bids, prepare the final construction contract and execute the <br />contract with the selected Contractor. <br />. The City will provide for any material and compaction tests, inspections, and reports, as <br />necessary for project construction. <br /> <br />Bancroft Middle School P1ayfields <br />Project No. 210-38-257 <br /> <br />October 25, 2006 <br />Page 21 of24 <br />
The URL can be used to link to this page
Your browser does not support the video tag.