My WebLink
|
Help
|
About
|
Sign Out
Home
Agmt 2006 Kennedy Jenks
CityHall
>
City Clerk
>
City Council
>
Agreements
>
2006
>
Agmt 2006 Kennedy Jenks
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/12/2006 4:34:41 PM
Creation date
12/12/2006 4:34:38 PM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Agreement
Document Date (6)
5/1/2006
Retention
PERM
Document Relationships
Reso 2006-044
(Approved by)
Path:
\City Clerk\City Council\Resolutions\2006
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />h. Prepare cost estimate. <br />1. Prepare draft engineering report addressing issues of concern to the California <br />Department of Health Services <br /> <br />De1iverables: Electronic and paper copies of 30% plans, outline specs, topographic <br />survey, cost estimate, and engineering report. 3 signed copies of soils report. Signed copy of <br />topographic survey. Description and discussion of treatment process and equipment. <br /> <br />2. Prepare 70% documents <br />a. Meet with city to review 30% comments <br />b. Prepare 70% documents showing all equipment and underground piping and <br />conduit. <br />c. Prepare equipment selection package with cut sheets describing recommended <br />equipment. Include information on alternate equipment or systems and justify <br />recommendations. <br />d. Prepare structural calculations <br />e. Prepare technical specifications (division 1 through 16). <br />f. Prepare cost estimate. <br />g. Prepare final engineering report addressing issues of concern to the California <br />Department of Health Services (DHS) <br />h. Prepare notice of intent and water reuse report per Municipal wastewater and <br />water agencies order 96-011 <br />1. Make permit submittal to DHS and Regional water quality board <br />J. Make permit submittal to City of San Leandro Community Development <br />Department (building department). <br /> <br />Deliverables: Electronic and paper copies of 70% plans, specs, cost estimate, and engineering <br />report. Written memo describing action taken to address each comment made at 30% submittal. <br />Copy of permit submittals. Copy of structural calculations (for building permit). <br /> <br />3. Prepare 100% documents <br />a. Meet with City to review 70% comments <br />b. Prepare 100% documents showing all details, dimensions, and notes <br />c. Prepare technical specifications, fully edited to completely describe the work <br />(division I through 16). <br />d. Review front end specifications (division 0, prepared by City). <br />e. Prepare cost estimate <br />f. Respond to permit comments from DHS and Regional water quality board. <br />g. Respond to permit comments from building department. <br /> <br />Deliverables: Electronic and paper copies of 100% plans, specs, and cost estimate. Written <br />memo describing action taken to address each comment made at 70% submittal. Copy of <br />response to permitting agencies. <br /> <br />Wastewater Treatment Plant Effluent Irrigation <br />Project No. 593-52-219 <br /> <br />April 4, 2006 <br />Page 160[22 <br />
The URL can be used to link to this page
Your browser does not support the video tag.