My WebLink
|
Help
|
About
|
Sign Out
Home
Agmt 2006 Kennedy Jenks
CityHall
>
City Clerk
>
City Council
>
Agreements
>
2006
>
Agmt 2006 Kennedy Jenks
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/12/2006 4:34:41 PM
Creation date
12/12/2006 4:34:38 PM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Agreement
Document Date (6)
5/1/2006
Retention
PERM
Document Relationships
Reso 2006-044
(Approved by)
Path:
\City Clerk\City Council\Resolutions\2006
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />EXHIBIT A-I <br />DETAILS OF DESIGN <br /> <br />Consultant shall exercise due professional care so that design shall be done in accordance <br />with the California Building Standards Code with City of San Leandro amendments. <br /> <br />The scope of this contract includes all architecture and engineering services as described <br />in Exhibit A required to complete the work. No work shown on the plans or listed in the <br />specifications shall be 'design build' unless it is specifically listed herein, or approved in <br />writing by the City. <br /> <br />Unique, proprietary, or experimental designs and materials are prohibited. <br /> <br />Specification shall be CSI format. Front end specifications (section 0000 - 0999) shall <br />be prepared by the City. Consultant shall prepare all other specifications. Consultant <br />shall coordinate the work with the front end specifications prepared by the City. <br />Performance specifications are prohibited. Specifications shall be coordinated with the <br />plans. <br /> <br />This work includes preparation of a soils report that contains design recommendations. <br />Design work shall be done in accordance with the recommendations. Consultant shall <br />communicate with the soils engineer as required to clarify or understand the <br />recommendations. The soils report is not a construction document; construction <br />requirements shall be included and shown completely on the plans and in the <br />specifications. <br /> <br />The City of San Leandro has established a budget for construction of improvements as <br />described in the contract. Consultant shall be responsible for designing within the <br />budget, should estimates or bids indicate that the contingency is below 7% then the <br />contractor shall redraw the plans as required to make the estimate match the budget. <br /> <br />The City has a standard door hardware specification guideline. All work shown shall <br />conform to said guideline. <br /> <br />The City has standard plans that indicate details of construction of many site <br />improvements. All work shown shall conform to the standard plans. <br /> <br />The site shall be graded so that storm water does not drain to adjacent property. <br /> <br />Wastewater Treatment Plant Effluent Irrigation <br />Project No. 593-52-219 <br /> <br />Apri14, 2006 <br />Page 18 of22 <br />
The URL can be used to link to this page
Your browser does not support the video tag.