Laserfiche WebLink
<br />· City's standard border, title block, and cover sheet. <br />· Environmental Documentation(CEQA). <br />· Front -end Docunlents (Division 0) <br />· Existing Soil's Reports <br />· Existing drawings <br />· City will be responsible for distribution of Contract Documents, receiving bidder questions <br />(Brown and Caldwell will respond to questions), distributing addenda (Brown and Caldwell <br />will develop addenda), and reviewing bids <br />· Waste activated sludge flows for the thickening unit <br />· Influent flow records for the last five years <br />· Review comments for each submittal <br />The following assumptions were made in developing the scope of work and estimate of engineering <br />fees: <br />· The Proj ect contains no lead or asbestos. <br />· A topographic survey is not needed. Existing drawings will be scanned and used as <br />background for the Project. <br />· A geotechnical investigation is not needed. It is assumed that the existing geotechnical <br />reports wi 11 contain the necessary information. <br /> <br />Schedule <br /> <br />Description <br />Task 2 and 3: 30% design <br />Task 4 and 5: 700/0 design <br />Task 6 and 7: 100% design <br />Task 8 and 9: Bid documents <br /> <br />Schedule <br />7 weeks from receipt of Notice to Proceed <br />5 weeks from 30% review meeting <br />4 weeks from 70% review meeting <br />2 weeks from receipt of 1000i<> comments <br /> <br />WPCP Electrical, WAS, Flow EQ <br />593-52-225 <br /> <br />Page 19 of24 <br />