My WebLink
|
Help
|
About
|
Sign Out
Home
Agmt 2006 Brown and Caldwell
CityHall
>
City Clerk
>
City Council
>
Agreements
>
2006
>
Agmt 2006 Brown and Caldwell
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/23/2007 4:13:50 PM
Creation date
1/23/2007 4:13:47 PM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Agreement
Document Date (6)
10/2/2006
Retention
PERM
Document Relationships
Reso 2006-112
(Approved by)
Path:
\City Clerk\City Council\Resolutions\2006
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />· City's standard border, title block, and cover sheet. <br />· Environmental Documentation(CEQA). <br />· Front -end Docunlents (Division 0) <br />· Existing Soil's Reports <br />· Existing drawings <br />· City will be responsible for distribution of Contract Documents, receiving bidder questions <br />(Brown and Caldwell will respond to questions), distributing addenda (Brown and Caldwell <br />will develop addenda), and reviewing bids <br />· Waste activated sludge flows for the thickening unit <br />· Influent flow records for the last five years <br />· Review comments for each submittal <br />The following assumptions were made in developing the scope of work and estimate of engineering <br />fees: <br />· The Proj ect contains no lead or asbestos. <br />· A topographic survey is not needed. Existing drawings will be scanned and used as <br />background for the Project. <br />· A geotechnical investigation is not needed. It is assumed that the existing geotechnical <br />reports wi 11 contain the necessary information. <br /> <br />Schedule <br /> <br />Description <br />Task 2 and 3: 30% design <br />Task 4 and 5: 700/0 design <br />Task 6 and 7: 100% design <br />Task 8 and 9: Bid documents <br /> <br />Schedule <br />7 weeks from receipt of Notice to Proceed <br />5 weeks from 30% review meeting <br />4 weeks from 70% review meeting <br />2 weeks from receipt of 1000i<> comments <br /> <br />WPCP Electrical, WAS, Flow EQ <br />593-52-225 <br /> <br />Page 19 of24 <br />
The URL can be used to link to this page
Your browser does not support the video tag.