Laserfiche WebLink
<br />Key details <br />Proposed design cross-sections <br />Controlling materials (i.e.; pipe types, equipment selections, building materials shall all <br />be defined. <br />Sheets showing plans view and elevation view to be 100%. <br />Construction sequencing discussed or determined. <br />Hours of work detern1ined <br /> <br />1000/0 Construction Plans are defined to include the following: <br /> <br />Complete construction drawings ready to bid and construct. <br /> <br />WPCP Electrical, WAS, Flow EQ <br />593-52-225 <br /> <br />Page 22 of 24 <br />