Laserfiche WebLink
<br />Monument to the foundry location if need be. Prior to producing the final Monument artwork <br />in bronze, Consultant shall notify City so it may have opportunity to conduct final inspection. <br /> <br />PHASE 4 - INST ALLA TION AND RECORD DRAWINGS <br /> <br />Consultant shall arrange, transport and install the Monument in accordance with th approved <br />plans and permits at the project site, which is located at the San Leandro Civic Center Plaza, 835 <br />East 14th Street, San Leandro, California. <br /> <br />DELIVERABLES: <br /> <br />Full size bronze sculpture including granite backdrop described in Phase 1, delivered and installed. <br /> <br />Upon substantial completion of the Work and prior to final acceptance by the City, the <br />Consultant shall complete and deliver the completed set of Record Drawings to the Engineer <br />conforming to the construction records of the Consultant. This set of drawings shall consist of <br />corrected plans showing the reported location of the Work. The information submitted by the <br />Consultant and incorporated by the Engineer into the Record Drawings will be assumed to be <br />reliable, and the Engineer will not be responsible for the accuracy of such information, nor for <br />any errors or omissions which may appear on the Record Drawings as a result. Such drawings <br />shall become the property of the City. <br /> <br />Final payment will not be approved until the Consultant-prepared Final Record Drawings have <br />been delivered to the Engineer. <br /> <br />SCHEDULE: <br /> <br />Consultant hereby agrees to provide for the Monument of which this agreement is subject <br />according to this time table: <br /> <br />Phase 1 - Final Design and Art Production <br />(Two Dimensional Artwork) <br />Phase 2 - Installation detail and specification <br />approval <br />Phase 3 - Fabrication Including Clay <br />Sculpting and Casting <br />Phase 4 - Installation and Record Drawings <br /> <br />8 to 10 weeks from contract <br />slgnmg <br />Prior to fabrication <br /> <br />8 to 14 weeks from approval of <br />Phase 1 <br />4 to 10 days following <br />monument delivery to site <br /> <br />Consulting Services Agreement between <br />City of San Leandro and Monument Arts, Inc. <br /> <br />1/9/06 <br />Page 18 of24 <br />