My WebLink
|
Help
|
About
|
Sign Out
Home
8H Consent 2007 0305
CityHall
>
City Clerk
>
City Council
>
Agenda Packets
>
2007
>
Packet 2007 0305
>
8H Consent 2007 0305
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/4/2007 12:41:52 PM
Creation date
3/1/2007 9:25:00 AM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Staff Report
Document Date (6)
3/5/2007
Retention
PERM
Document Relationships
_CC Agenda 2007 0305
(Reference)
Path:
\City Clerk\City Council\Agenda Packets\2007\Packet 2007 0305
Reso 2007-025
(Reference)
Path:
\City Clerk\City Council\Resolutions\2007
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />CITY OF SAN LEANDRO <br /> <br />STAFF REPORT <br /> <br />APPROVED AND <br />FORWARDED <br />TO CITY COUNCIL <br /> <br />TO: <br /> <br />John Jermanis, City Manager <br /> <br /> <br />DATE: <br /> <br />March 5,2007 <br /> <br />FROM: <br /> <br />Uchenna Udemezue, Director <br />Engineering and Transportation <br /> <br /> <br />BY: <br /> <br />Kenneth Joseph, City Engineer <br /> <br />SUBJECT PROJECT/PROJECT DESCRI TION: <br /> <br />RESOLUTION ACCEPTING THE WORK FOR THE DAVIS STREET/EAST 14TH STREET <br />LIGHTING AND PEDESTRIAN IMPROVEMENTS, PROJECT NO. 03-961-83-062 <br /> <br />This project provided new decorative streetlights along East 14th Street from Parrott Street to <br />Hays Street and along Davis Street from Hays Street to East 14th Street. <br /> <br />SUMMARY AND RECOMMENDATION <br /> <br />Staff recommends acceptance of the work, filing of the Notice of Completion, and upon <br />completion to the satisfaction of the City Engineer of the one-year maintenance period, hereby <br />authorizes the City Manager to release the Maintenance Bond for the subject project. <br /> <br />BACKGROUND <br /> <br />As part of the overall improvements for the downtown area, the City Council approved <br />pedestrian enhancements along East 14th Street in the Capital Improvement Program (CIP) <br />budget for Fiscal Year 2002-03. <br /> <br />Analysis <br /> <br />On September 6, 2005 by Resolution No. 2005-132, the construction of the Davis Street/East <br />14th Street Lighting Improvements was awarded to St. Francis Electric. The improvement <br />included replacing the existing street lighting with decorative fixtures along East 14th Street <br />from Parrott Street to Hays Street and along Davis Street from East 14th Street to Hays Street. <br />Also, new conductors and a service cabinet were installed and connected to a PG&E transformer <br />in the plaza area near the Wells Fargo building. An additional service cabinet was installed as <br />part of this project to power the Redflex camera installed at the Davis Street and East 14th Street <br />intersection. <br /> <br />The construction is now complete and staff recommends acceptance of the project. <br />
The URL can be used to link to this page
Your browser does not support the video tag.