<br />BID SUMMARY
<br />
<br /> BID OPENING ENGINEER'S ESTIMATE McGuire and Hester Bay Cities Paving & Grading, Inc. Sposeto Engineering, Inc.
<br /> DATE: Tuesday, February 6,2007 Date Approved: 12/19/2006 9009 Railroad Avenue 5029 Forni Drive 4301 Bettencourt Way
<br /> TIME: 3:00 P.M. Prepared by: AO Oakland, CA 94603 Concord, CA 94520 Union City, CA 94587
<br />LOCATION: Manager Large Conference Room Phone: (510) 632-7676 Phone: (925) 687-6666 Phone: (510) 487-2424
<br /> Fax (510) 562-5209 Fax: (925) 687-2122 Fax (510) 487-6210
<br />ITEM
<br />NO. QUANTITY ITEM UNIT COST ITEM COST UNIT COST ITEM COST UNIT COST ITEM COST UNIT COST ITEM COST
<br />17 91 M Concrete Band at Median $45.00 $4.095.00 $61.00 $5,551.00 $90.00 $8,190.00 $8300 $7,553.00
<br />18 63 M Precast Concrete Bands at $60.00 $3,780.00 $71.00 $4,473.00 $4.00 $252.00 $83.00 $5,229.00
<br /> Gateway Monument Plaza
<br />19 85 M2 Stamped Concrete at Gateway $107.64 $9,149.40 $190.00 $16,150.00 $212.00 $18,020.00 $410.00 $34,850.00
<br /> Monument
<br />20 143 M2 Cobble paving at Median $140.00 $20,020.00 $188.00 $26,884.00 $25000 $35,750.00 $197.00 $28,171.00
<br />21 71 M2 Decomposed Granite at Median $32.24 $2,289.04 $6200 $4,402.00 $9.60 $681.60 $76.00 $5,396.00
<br />22 1 LS Chain-linked Fence at Gateway $4,000.00 $4,000.00 $5,600.00 $5,600.00 $6,113.00 $6,113.00 $6,000.00 $6,000.00
<br /> Monuments
<br />23 2 EA Gateway Monument $82,000.00 $164,000.00 $85,000.00 $170,000.00 $98,578.50 $197,157.00 * $130,000.00 $260,000.00
<br />24 OM Header (50x1 01) $10.00 $0.00 $0.00 $0.00 $000 $000
<br />25 450 M Header (50x300) $30.00 $13,500.00 $25.00 $11,250.00 $49.50 $22,275.00 $49.00 $22,050.00
<br />26 '3,596 M3 Import Topsoil (40" deep) $50.00 $179,800.00 $54.00 $194,184.00 $49.50 $178.002.00 $45.00 $161,820.00
<br />27 4,870 M2 Fine Grading $5.00 $24,350.00 $5.00 $24,350.00 $1.76 $8,571.20 $6.40 $31,168.00
<br />28 1 LS Automatic Irrigation $180,000.00 $180,000.00 $79,000.00 $79,000.00 $147,280.00 $147,28000 $170,000.00 $170,000.00
<br />29 87 EA Plant 24" Box Trees $325.00 $28,275.00 $302.00 $26,274.00 $220.00 $19,140.00 $350.00 $30,450.00
<br />30 1,247 EA Plant 5 gallon Trees $32.00 $39,904.00 $17.00 $21,199.00 $23.10 $28,805.70 $2300 $28,681.00
<br />31 510 EA Plant 1 gallon Trees $15.00 $7,650.00 $9.00 $4,590.00 $11.00 $5,610.00 $10.00 $5,100.00
<br />32 2,377 M2 Bark Mulch $4.00 $9,508.00 $3.00 $7,131.00 $3.30 $7,844.10 $3.00 $7,131.00
<br />33 1 LS 180 Day Plant Establishment & $10,000.00 $10,000.00 $12,000.00 $12,000.00 $4,400.00 $4,400.00 $7,000.00 $7.000.00
<br /> Maintenance
<br />34 1 LS Signal Relocation $150,000.00 $150,000.00 $66,000.00 $66,000.00 $87,725.00 $87,725.00 $85,000.00 $85,000.00
<br />35 1 LS Paint existing electroliers, light $75,000.00 $75,000.00 $14,700.00 $14,700.00 $66,000.00 $66.000.00 $5,600.00 $5,600.00
<br /> poles and fixtures
<br /> TOTAL BASE BID $2,122.93216 $1,806,055.00 $2,436,285.70 * $2,925,346.00
<br />BID ALTERNATE NO.1
<br />36 1 LS Additional Landscaping on West $76,830.00 $76,830.00 $46,000.00 $46,000.00 $20,000.00 $20,000.00 $4,600.00 $4,60000
<br /> and East sides of Doolittle Dr.
<br /> TOTAL BID AL TERNA TE NO.1: $76,830.00 $46,000.00 $20,000.00 $4,600.00
<br />
<br />Bid Summ - Doolittle Entryway-Ph1.xls
<br />
<br />Page2of3
<br />
<br />Printed 2/7/2007 @ 10:47 AM
<br />
|