<br />BID SUMMARY
<br />
<br />
<br />
<br />This document is a summary of bids received for the subject project and are provide
<br />only as a convenience. Listing of a particular bid is not a finding that such bid has bee
<br />found to be responsive or accepted as complete by the City. An award of contract, if any
<br />is subject to approval of the City Council and/or the City Manager. Contractors shoul
<br />refer to the contract documents for bidding information.
<br />
<br />
<br />PROJECT TITLE: Doolittle Drive Entryway Improvements, Phase 1
<br />PROJECT NO.: # 02-230-43-155
<br />BID NO: N/A
<br />
<br /> BID OPENING ENGINEER'S ESTIMATE McGuire and Hester Bay Cities Paving & Grading, Inc. Sposeto Engineering, Inc.
<br /> DATE: Tuesday, February 6, 2007 Date Approved: 12/19/2006 9009 Railroad Avenue 5029 Forni Drive 4301 Bettencourt Way
<br /> TIME: 3:00 P.M. Prepared by: AO Oakland, CA 94603 Concord, CA 94520 Union City, CA 94587
<br />LOCATION: Manager Large Conference Room Phone: (510) 632-7676 Phone: (925) 687-6666 Phone: (510) 487-2424
<br /> Fax: (510) 562-5209 Fax (925) 687-2122 Fax: (510) 487-6210
<br />ITEM
<br />NO. QUANTITY ITEM UNIT COST ITEM COST UNIT COST ITEM COST UNIT COST ITEM COST UNIT COST ITEM COST
<br />BASE BID:
<br />1 1 LS Mobilization (5%) $97,518.02 $97,518.02 $113,600.00 $113,600.00 $137,923.50 $137,923.50 $265,000.00 $265,000.00
<br />2 1 LS Water Pollution Control $10,000.00 $10,000.00 $8,00000 $8,000.00 $11,000.00 $11,000.00 $10,000.00 $10,00000
<br />3 1 LS Temporary Concrete Wash-out $5,000.00 $5,000.00 $3,000.00 $3,000.00 $6,600.00 $6,600.00 $7,000.00 $7,000.00
<br /> Facility
<br />4 1 LS Traffic Control System and $60,00000 $60,000.00 $38,000.00 $38,000.00 $62,460.00 $62,460.00 $82,000.00 $82,000.00
<br /> Construction Area Signs
<br />5 1 LS Pedestrian Access $1,000.00 $1,000.00 $2,50000 $2,500.00 $22,000.00 $22,000.00 $10,00000 $10,000.00
<br />6 5,020 M3 Demolition, Saw-Cutting, $65.00 $326,300.00 $60.00 $301,200.00 $112.00 $562,240.00 $144.00 $722,880.00
<br /> Excavation & Off-haul
<br />7 1 LS Grading & Drainage Systems $75,000.00 $75,000.00 $87,300.00 $87,300.00 $94,874.00 $94,874.00 $144,000.00 $144,000.00
<br /> (including new inlets and piping)
<br />8 3 EA Adjust Manholes $2,000.00 $6,000.00 $1,300.00 $3,900.00 $880.00 $2,640.00 $1,400.00 $4,20000
<br />9 3 EA Convert SD into MH $3,000.00 $9,000.00 $4,80000 $14,400.00 $3,300.00 $9,900.00 $2,600.00 $7,800.00
<br />10 1 LS Site Electric (New Light Poles, $180,000.00 $180,000.00 $223,000.00 $223,000.00 $240,000.00 $240,000.00 $228,000.00 $228,000.00
<br /> Uplights and Fixtures)
<br />11 540 TN Asphalt Paving $190.00 $102,600.00 $13700 $73,980.00 $275.00 $148,500.00 $20900 $112,860.00
<br />12 1 LS Striping and Signage $85,000.00 $85,000.00 $91,229.00 $91,229.00 $62,706.60 $62,706.60 $58,00000 $58,000.00
<br />13 469 M Concrete Curb & Gutter $98.50 $46,196.50 $8000 $37,520.00 $106.00 $49,71400 $190.00 $89,110.00
<br />14 654 M Concrete Curb & Medians $95.00 $62,130.00 $53.00 $34,662.00 $88.00 $57,552.00 $190 00 $124,260.00
<br />15 427 M2 Concrete Sidewalk $130.00 $55,510.00 $67.00 $28,609.00 $9800 $41,84600 $151.00 $64,477.00
<br />16 591 M2 Concrete Driveway $129.20 $76,357.20 $87.00 $51,417.00 $143.00 $84,513.00 $160.00 $94,560.00
<br />
<br />Bid Summ - Doolittle Entryway-Ph 1.xls
<br />
<br />Page 1 of 3
<br />
<br />Printed 2/7/2007 @ 10:47 AM
<br />
|