<br />PROJECT TITLE: Doolittle Drive Entryway Improvements, Phase 2
<br />PROJECT NO.: # 02-230-43-155
<br />BID NO.: N/A
<br />
<br /> BID OPENING ENGINEER'S ESTIMATE McGuire and Hester Golden Bay Construction Sposeto Engineering, Inc.
<br /> DATE: Tuesday, February 6, 2007 Date Approved: 12/19/2006 9009 Railroad Avenue 3826 Depot Road 4301 Bettencourt Way
<br /> TIME: 3;00 P.M. Prepared by: AO Oakland, CA 94603 Hayward, CA 94545 Union City, CA 94587
<br />LOCATION: City Manager Large Conference Phone: (510) 632-7676 Phone: (510) 783-2960 Phone: (510) 487-2424
<br /> Room Fax: (510) 562-5209 Fax (510) 783-2971 Fax: (510) 487-6210
<br />ITEM
<br />NO. QUANTITY ITEM UNIT COST ITEM COST UNIT COST ITEM COST UNIT COST ITEM COST UNIT COST ITEM COST
<br />BASE BID;
<br />1 1 LS Water Pollution Control $10,000.00 $10,000.00 $8,000.00 $8,00000 $4,200.00 $4,200.00 $6,000.00 $6,000.00
<br />2 1 LS Temporary Concrete Wash-out $5,000.00 $5,000.00 $3,000.00 $3,000.00 $1,00000 $1,000.00 $2,500.00 $2,500.00
<br /> F aGilities
<br />3 1 LS Traffic Control System and $60,000.00 $60,000.00 $29,300.00 $29,300.00 $46,900.00 $46,900.00 $56,000.00 $56,000.00
<br /> Construction Area Signs
<br />4 1 LS Pedestrian Access $1,000.00 $1,000.00 $2,500.00 $2,500.00 $6,131.00 $6,131.00 $4,000.00 $4,000.00
<br />5 5,383 M3 Demolition, Saw-Cutting, $65.00 $349,895.00 $52.00 $279,91600 $57.00 $306,831.00 $98.00 $527,534.00
<br /> Excavation & Off-haul
<br />6 1 LS Grading and Drainage Systems $55,000,00 $55,000.00 $104,000.00 $104,00000 $123,200.00 $123,200,00 $148,000.00 $148,000.00
<br /> (including new inlets and piping)
<br />7 6 EA Convert SD into MH $3,000.00 $18,000.00 $3,680.00 $22,080,00 $1,144.00 $6,864.00 $1,900.00 $11,400.00
<br />8 6 EA Adjust Manholes to Grade $2,000.00 $12,000,00 $455.00 $2.73000 $343.00 $2,058,00 $1,20000 $7,20000
<br />9 1 LS Site Electric (New Light Poles, $100,000.00 $100,000.00 $158,471.00 $158,471.00 $143,000.00 $143,000.00 $165,000.00 $165,00000
<br /> Fixtures, meters and Conduits)
<br />10 548 TN Asphalt Paving $19000 $104,120.00 $130,00 $71,24000 $20500 $112,340,00 $176,00 $96,448.00
<br />11 1 LS Striping and Signage $78,000.00 $78,000.00 $85,660.00 $85,660,00 $51,125.00 $51,125.00 $48,00000 $48,000,00
<br />12 762 M Concrete Curb & Gutter $98,50 $75,057.00 $88.00 $67,056,00 $6500 $49,530.00 $15100 $115,062.00
<br />13 250 M Concrete Curb & Median $98.50 $24,625.00 $65.00 $16,250.00 $51.00 $12,750.00 $138.00 $34,500.00
<br />14 325 M2 Concrete Sidewalk $130.00 $42,250.00 $62.00 $20,150.00 $122,00 $39,650.00 $125.00 $40,625.00
<br />15 1,036 M2 Concrete Driveway $129.20 $133,851.20 $100.00 $103,600.00 $115.00 $119,140.00 $129.00 $133,644.00