My WebLink
|
Help
|
About
|
Sign Out
Home
3B Public Hearing 2007 0402
CityHall
>
City Clerk
>
City Council
>
Agenda Packets
>
2007
>
Packet 2007 0402
>
3B Public Hearing 2007 0402
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/4/2007 12:39:34 PM
Creation date
3/28/2007 3:46:18 PM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Staff Report
Document Date (6)
4/2/2007
Retention
PERM
Document Relationships
_CC Agenda 2007 0402
(Reference)
Path:
\City Clerk\City Council\Agenda Packets\2007\Packet 2007 0402
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
65
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />reservations, or other exactions imposed on this Project by these Conditions of <br />Approval) will begin on the date of the conditional approval of this Project. If the <br />Applicant/property owner fails to file a protest within this 90-day period, complying <br />with all of the requirements of Government Code Section 66020, they will be <br />legally barred from later challenging any such fees, dedications, reservations, or <br />other exactions. <br /> <br />3. Public Utility Easements shall be provided over all off-site and on-site <br />improvements that do not already have easements. Public utility easements <br />(PUEs), five (5) feet wide, shall be located behind and parallel with the private <br />street rights-of-way. Additional PUEs, three (3) feet wide, shall be located on <br />each side property line of each lot from the back of the sidewalk to the front of the <br />building where utility meters or boxes are installed. The Sub-divider shall dedicate <br />public utility and emergency access easements on the Final Map, as directed by the <br />City Engineer. <br /> <br />4. Prior to approval of the first Final Map, the Sub-divider shall submit for approval by <br />the City Engineer, an overall site master plan for infrastructure and detailed site <br />infrastructure plans required for the Final Map. <br /> <br />5. Prior to approval of the first Final Map, the Sub-divider shall submit an estimate of <br />the cost of all work and improvements to be performed, both within the public <br />rights-of-way and the project boundaries for approval by the City Engineer. <br /> <br />6. Prior to the approval of Final Map, the Sub-divider shall provide the City Engineer <br />with an updated Preliminary Title Report, prepared within three (3) months prior to <br />the submittal of the Pinal Map to the City Engineer for review for all lands <br />contained within the boundary of that Final Map. <br /> <br />7. All typical street fixtures, including but not limited to fire hydrants, electroliers, <br />signs, and utility boxes, shall be located within the P.D.E. behind the private <br />sidewalks. <br /> <br />8. Emergency Vehicle Access Easements shall be provided over the entire private <br />street system and within the parking areas and any other areas as directed by the <br />Fire Department. The proposed Emergency Vehicle Access Easement shall be <br />designed and constructed to support the imposed load of fire fighting apparatus. fu <br />addition, the access to, and geometric configuration of, this easement shall be <br />approved, in writing, by the Fire Department prior to the approval of the final map <br />for Tract 7382. <br /> <br />9. "No Parking Any Time" signs shall be installed, and enforced by the Property <br />owner's Association through the CC&R's, to provide emergency vehicle access as <br />directed by the Fire Department. <br /> <br />Revised Reconnnended Conditions of Approval <br />PLN2002-00031 Bayside Business Park <br /> <br />November 4, 2002 <br />Page 14 <br />
The URL can be used to link to this page
Your browser does not support the video tag.