Laserfiche WebLink
<br />DISCUSSION: <br /> <br />There are no known mineral resources at or near the project site, according to the San Leandro <br />General Plan (City of San Leandro, 2002). <br /> <br />XI. NOISE -- Would the project result in: <br />a) Exposure of persons to or generation of noise levels <br />in excess of standards established in the local general <br />plan or noise ordinance, or applicable standards of other <br />agencies? <br />b) Exposure of persons to or generation of excessive <br />ground borne vibration or ground borne noise levels? <br />c) A substantial pennanent increase in ambient noise <br />levels in the project vicinity above levels existing <br />without the project? <br />d) A substantial temporary or periodic increase in <br />ambient noise levels in the project vicinity above levels <br />existing without the project? <br />e) For a project located within an airport land use plan <br />or, where such a plan has not been adopted, within two <br />miles of a public airport or public use airport, would the <br />project expose people residing or working in the project <br />area to excessive noise levels? <br />f) For a project within the vicinity of a private airstrip, <br />would the project expose people residing or working in <br />the project ~ea to excessive noise levels? <br /> <br />DISCUSSION: <br /> <br />Potentially <br />Significant <br />Impact <br /> <br />Potentially <br />Significant unless <br />Mitigation <br />Incorporated <br /> <br />Less than <br />Significant <br />Impact <br /> <br />No <br />Impact <br /> <br />o <br /> <br />~ <br /> <br />~ <br />o <br /> <br />o <br /> <br />~ <br /> <br />There are currently no sensitive receptors (e.g., schools, hospitals, or significant groups of <br />residences) in the area within 1,000 feet (304.8 meters) of the project site. The nearest individuals <br />who could be affected by construction noise from the project would be users of the undeveloped <br />Oyster Bay Regional Shoreline park and workers at the City's wastewater treatment plant or at the <br />adjacent industrial businesses along Davis Street or Neptune Drive. The nearest collection of single <br />family residences is approximately 3,000 feet (914.4) south of the project site in the neighborhood <br />adjacent to the San Leandro Marina <br /> <br />o <br /> <br />o <br /> <br />~ <br /> <br />Construction of the bicycle/pedestrian trail and bridge would involve the use of diesel-powered <br />heavy equipment for limited excavation, delivery of materials, driving of bridge piers and placement <br />of bridge truss sections with a crane, cement mixing, backfilling of excavated areas, and paving of <br />the trail. Based on U.S. EPA data on typical noise ranges generated by earth moving equipment <br />(excavators, backhoes, and trucks), such equipment could generate temporary noise levels of about <br /> <br />Y4204IS.00693.doc - 4/5/07 <br /> <br />o <br /> <br />o <br /> <br />o <br /> <br />o <br />o <br /> <br />o <br />o <br /> <br />~ <br /> <br />o <br /> <br />o <br /> <br />o <br /> <br />~ <br /> <br />o <br /> <br />o <br /> <br />o <br /> <br />-32- <br />