Laserfiche WebLink
<br />Incorporation of the mitigation measure above would reduce this impact to less than significant. <br /> <br />XVI. UTILITIES AND SERVICE SYSTEMS -Would <br />the project: <br /> <br />a) Exceed wastewater treatment requirements of the <br />applicable Regional Water Quality Control Board? <br /> <br />b) Require or result in the construction of new water or <br />wastewater treatment facilities or expansion of existing <br />facilities, the construction of which could cause <br />significant environmental effects? <br /> <br />c) Require or result in the construction of new storm <br />water drainage facilities or expansion of existing <br />facilities, the construction of which could cause <br />significant environmental effects? <br /> <br />d) Have sufficient water supplies available to serve the <br />project from existing entitlements and resources, or are <br />new or expanded entitlements needed? <br /> <br />e) Result in a determination by the wastewater treatment <br />provider which serves or may serve the project that it has <br />adequate capacity to serve the project's projected <br />demand in addition to the provider's existing <br />commitments? <br /> <br />f) Be served by a landfill with sufficient permitted <br />capacity to accommodate the project's solid waste <br />disposal needs? <br /> <br />g) Comply with federal, state, and local statutes and <br />regulations related to solid waste? <br /> <br />DISCUSSION: <br /> <br />Potentially <br />Significant <br />Impact <br /> <br />Potentially <br />Significant unless <br />Mitigation <br />Incorporated <br /> <br />Less than <br />. Significant <br />Impact <br /> <br />No <br />Impact <br /> <br />~ <br />~ <br /> <br />~ <br /> <br />~ <br /> <br />~ <br /> <br />~ <br /> <br />~ <br /> <br />The bridge and trail site is not currently served by public water or wastewater services. Water and <br />toilet facilities are available only near the entrance to the Oyster Bay Regional Shoreline park at the <br />end of Neptune Drive. The project would not require construction of any new wastewater, water <br />supply, or storm water drainage facilities. <br /> <br />o <br />o <br /> <br />o <br />o <br /> <br />o <br />o <br /> <br />The project site is not currently served by a local solid waste hauler. The nearest waste disposal <br />facilities are at the entrance to the Oyster Bay Regional Shoreline park at the end of Neptune Drive. <br /> <br />Y 4204IS.00693.doc - 4/5/07 <br /> <br />o <br /> <br />o <br /> <br />o <br /> <br />o <br /> <br />o <br /> <br />o <br /> <br />o <br /> <br />o <br /> <br />o <br /> <br />o <br /> <br />o <br /> <br />o <br /> <br />o <br /> <br />o <br /> <br />o <br /> <br />-41- <br />