Laserfiche WebLink
<br />APPLICANT'S SUPPORTING STATEMENT <br /> <br />We have been diligently creating construction drawings for the project. There was unusual delay <br />in designing the retail building. A redesign was necessary due to the weight of the clay tile roof. <br />Asbestos has been legally removed from the site. <br /> <br />We are within a few weeks from entering our improvement plans to the City Building <br />Department for plan check approval and expect to break ground within 45 to 60 days based on <br />completed plan check process allowing us to quickly move forward to demolition and <br />construction. <br /> <br />BACKGROUND AND SURROUNDING AREA <br /> <br />In March 2006 the property was rezoned so that the rear two-thirds of the property was <br />designated an IL zoning district, which would be developed with the self-storage compound. A <br />self-storage facility is conditionally permitted under this designation. The front one-third of the <br />site retained the CC designation. The PD overlay district was applied to the entire site so that the <br />project could be reviewed concurrently with the rezoning request. <br /> <br />Also in March 2006, a Mitigated Negative Declaration was adopted which concluded that the <br />development of the proposed project would not result in any potentially significant impacts that <br />could not be mitigated to a level of insignificance. All mitigation measures mentioned in the <br />Initial Study and Negative Declaration were included as conditions of approval in the planned <br />development. <br /> <br />Last January 2007, the applicant came to the Planning Commission and requested feedback and <br />direction from the Commission about the potential use of alternative metal tile products to <br />substitute in place of a clay tile roof for the mixed-use speculative commercial/light industrial <br />building and the manager's office and living quarters building. After examining the products, <br />reviewing the proposed application on the buildings, and hearing from the applicant, the <br />consensus from the Planning Commission was that the metal products were not an acceptable <br />substitute for the clay tile roof. <br /> <br />The subject property encompasses 3.25 acres and is located on the east side of Washington <br />Avenue and is south of 143rd Avenue. To the north, fronting Washington Avenue, are various <br />auto repair businesses. To the north, fronting 143rd Avenue, is a telephone company's <br />corporation yard. Adj acent to the east is an industrial park complex occupied by an ambulance <br />service and a car rental business. To the south is the Oroweat distribution warehouse and retail <br />store, and Kraft General Foods. Across Washington Avenue, to the west, is Rogers Trucking <br />Company. The subject property is in the Joint San Leandro/Alameda County Redevelopment <br />Area. <br /> <br />PROPOSAL <br /> <br />Planned Development - Site Plan <br /> <br />The site would be completely cleared and newly developed. The front one-third of the property <br />would contain a 10,589 square-foot speculative commercial/industrial space, a two-story <br /> <br />Planning Commission Staff Report <br />PLN2007 -00027 <br /> <br />June 14,2007 <br />Page 2 of7 <br />