My WebLink
|
Help
|
About
|
Sign Out
Home
3A Public Hearing 2008 0122
CityHall
>
City Clerk
>
City Council
>
Agenda Packets
>
2008
>
Packet 2008 0122
>
3A Public Hearing 2008 0122
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/22/2008 10:22:05 AM
Creation date
1/22/2008 10:22:03 AM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Staff Report
Document Date (6)
1/22/2008
Retention
PERM
Document Relationships
_CC Agenda 2008 0122
(Reference)
Path:
\City Clerk\City Council\Agenda Packets\2008\Packet 2008 0122
MO 2008-004
(Reference)
Path:
\City Clerk\City Council\Minute Orders\2008
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
102
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
L. During any construction activity the following high standards for sanitation are <br />required: Garbage cans, construction dumpsters, and debris piles shall be removed <br />on a minimum weekly basis. All food related trash items such as wrappers, cans, <br />bottles, and food scraps shall be disposed of in closed containers only and shall be <br />regularly removed from the site. Inspections, conducted as part of the regular <br />construction compliance, will be conducted to ensure compliance of the Applicant <br />and contractors with this requirement. <br />M. Construction activity in the City public right-of--way shall not commence prior to <br />8:00 a.m. and shall cease by 5:00 p.m., Monday through Friday, unless otherwise <br />approved in writing by the City Engineer. There shall be no construction activity on <br />Saturdays, Sundays or City, federal, or state holidays in the City public right-of--way. <br />N. The applicant shall coordinate all facility adjustments, relocations, or additions to <br />utility services with the appropriate utility companies. <br />O. Applicant shall design pervious pavement to discharge storm water to an unpaved <br />area wherever practical. <br />P. Applicant shall mark all on-site storm drain inlets with the words "No Dumping! <br />Flows to Bay" <br />Q. Applicant shall design landscaping to collect runoff from sprinklers and rain by <br />incorporating elements that collect, detain, and infiltrate runoff wherever practical. <br />R. Applicant shall provide a roofed and enclosed area for dumpsters and recycling <br />containers. The area shall be designed to prevent water run-on to the area and <br />runoff from the area and to contain litter and trash, so that it is not dispersed by <br />the wind or runoff during waste removal. <br />S. Applicant shall either provide a roofed, bermed area for car washing activities or <br />prohibit vehicle washing in the CC&Rs and by removing hose bibs (faucets) and <br />installing signs prohibiting such activity. <br />T. Applicant shall create CC&Rs that require sidewalks and parking lots to be swept <br />regularly to minimize the accumulation of litter and debris. Steam cleaning or low <br />volume pressure washing may be performed only after pre-cleaning using dry <br />methods, spot cleaning and recover in stained areas and removal of all mobile <br />pollutants. Debris resulting from pressure washing shall be trapped and collected <br />to prevent entry into the storm drain system. Wastewater containing any soap, <br />cleaning agent or degreaser shall not be discharged to the storm drain. [Conditions <br />P. -U. were recommended by the City Engineer to comply with National Pollutant <br />Discharge Elimination System NPDES requirements.] <br />Recommended Conditions of Approval (Revised) December 13, 2007 <br />PLN2006-00059 Page 7 of 14 <br />
The URL can be used to link to this page
Your browser does not support the video tag.