Laserfiche WebLink
EXHIBIT A <br />SCOPE OF SERVICES <br />Description <br />A roof survey was conducted in 2006 by Skyline Engineering, Inc to investigate the condition of all roofs on <br />City owned buildings. Several roofs where noted in poor condition and appropriate repair and replacement <br />was recommended. This is the Phase III of a three phase program to repair and replace deficient roofs. <br />This contract is to provide professional services to the City for design, bidding and construction support for <br />the Roof Repair and Replacement Project '09 - '10. The scope for this project includes the repair of roofs <br />on buildings owned by the City at the following locations: <br />1) City Hall (Roof Areas A - G) <br />2) Public Works <br />a. Building/Electrical Building <br />b. Streets/Landscaping Building <br />c. Fuel/Records Building <br />3) Cherry Grove Park Maintenance Shed <br />4) Pacific Ball Park Score Booths (2 total) <br />5) San Leandro Ball Park Score Booth <br />6) Park Median Crew Shed (old Bike Barn near Marina) <br />Scope <br />1) Asbestos Testing. <br />2) Two (2) design field inspections of the site in order to verify construction and conditions. <br />3) Review plans of existing buildings supplied by the City. <br />4) Discuss the findings of the field inspection and provide recommendations on repair and <br />replacement. <br />5) Develop design repair/replacement drawings of the roofs. Provide a specification section for the <br />removal and reinstallation of HVAC duct work. <br />6) Prepare construction specifications in City's standard format. <br />7) Calculate quantities and prepare cost estimate. <br />8) Obtain building permit from City's Building Department. <br />9) Construction support services <br />a. Assistance through bidding, preparation of addenda, attending pre-bid conference. <br />b. Interpret construction documents, review shop drawings and other contractor submittals, <br />respond to RFI's and change order requests. <br />c. Review City's front end documents of the spec package. <br />d. Observe construction operations and site conditions. <br />e. Provide inspection services as necessary with formal written reports after each visit; <br />deliver to the City. <br />f. Prepare punch list and conduct final inspection. <br />Consulting Services Agreement between June 19~, 2008 <br />City of San Leandro and Skyline Engineering--Exhibit A Page 15 <br />