My WebLink
|
Help
|
About
|
Sign Out
Home
Agmt 2008 Skyline Engineering Inc (2)
CityHall
>
City Clerk
>
City Council
>
Agreements
>
2008
>
Agmt 2008 Skyline Engineering Inc (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/25/2008 9:20:22 AM
Creation date
7/25/2008 9:20:22 AM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Agreement
Document Date (6)
7/21/2008
Retention
PERM
Document Relationships
Reso 2008-088
(Approved by)
Path:
\City Clerk\City Council\Resolutions\2008
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
21
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Consultant Deliverables <br />Phase 1 -1) Asbestos Test Results <br />2) 70% Design <br />• Plans in City standard format - 6 copies; indicating locations and types of <br />repairlreplacementavd to show onsite improvements to be protected or <br />restored to pre-construction condition. <br />• Technical Specification - 6 sets; prepared in the City's standard format in MS <br />Word. <br />• Cost Estimate - 6 copies; estimated cost of construction broken down into <br />standard bid items for all elements shown the on the plans. <br />Phase 2 -100°I° Design <br />• Development of all items listed in Phase 1 <br />1. <br />above, incorporating City comments from Phase <br />• Coordination with City Building Department to obtain Building Permit. <br />Phase 3 -Final Design <br />• Plans - 3 set; incorporating City comments from 100% review, provided on mylar or <br />vellum, stamped & wet signed plus 1 set in AutoCAD format on CD. <br />• Technical Specifications plus bid item list - 3 set; incorporating City comments from 100% <br />review provided as a hardcopy plus 1 electronic copy in MS Word. <br />• Final Cost Estimate - 3 set; estimated cost of construction broken down into standard bid <br />items for all elements shown on the plans. <br />• Respond to Building Permit application comments. <br />City Deliverables <br />Plans for existing buildings (if available). <br />Aerial photographs of existing roofs. <br />Schedule (Upon receiving the Notice to Proceed) <br />• Asbestos Testing & 70% Design Submittal 4 weeks <br />• City review period 4 weeks <br />• 100% Design submittal 3 weeks <br />• City review period 3 weeks <br />• Final Design submittal 2 weeks <br />Total 16 weeks <br />Consulting Services Agreement between June 19~, 2008 <br />City of San Leandro and Skyline Engineering--Exhibit A Page 16 <br />
The URL can be used to link to this page
Your browser does not support the video tag.