My WebLink
|
Help
|
About
|
Sign Out
Home
8F Consent 2008 0915
CityHall
>
City Clerk
>
City Council
>
Agenda Packets
>
2008
>
Packet 2008 0915
>
8F Consent 2008 0915
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/12/2008 9:58:36 AM
Creation date
9/12/2008 9:58:35 AM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Staff Report
Document Date (6)
9/15/2008
Retention
PERM
Document Relationships
_CC Agenda 2008 0915
(Reference)
Path:
\City Clerk\City Council\Agenda Packets\2008\Packet 2008 0915
Reso 2008-118
(Reference)
Path:
\City Clerk\City Council\Resolutions\2008
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
26
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• On May 19, 2008, by Resolution No. 2008-052, the City Council approved the plans and <br />specifications, and called for bids for Phase 2 of the project <br />• On July 28, 2008, by Resolution No. 2008-094, the City Council approved a cooperation <br />agreement between the City of San Leandro and the Redevelopment Agency of the City of <br />San Leandro for the purpose of undertaking redevelopment activities within the Alameda <br />County -City of San Leandro Redevelopment Area at a cost not to exceed Thirteen Million <br />and no/100 Dollars ($13,000,000) to the Redevelopment Agency <br />• On July 28, 2008, by Resolution No. 2008-095, the City Council awarded a contract to Alten <br />Construction, Inc. for the construction of the Senior Center Phase 2 Improvements <br />City Council Committee Review and Action <br />• The Facilities Committee reviewed the conceptual plans for the site and building in 2003 <br />• The Facilities Committee reviewed the design contract and fee in February 2006 <br />• On February 28, 2007, the final conceptual exterior elevations, floor plan, and layout of the <br />Senior Center project were presented and approved by the Facilities Committee. Inclusion of <br />provisions to allow the Senior Center to serve as an Emergency Operations Center during a <br />state of emergency were also approved <br />• Exterior elevations for the Phase 2 building improvements were approved by the Facilities <br />Committee in September 2007. Regular updates during the project design were presented to <br />the Senior Commission <br />Applicable General Plan Policy <br />• Policy 50.01--Access to senior services should be improved through planning, advocacy, and <br />the use of City resources to address identified needs <br />Action 5.01-A Develop a senior center <br />Permits and/or Variances Granted <br />• This project is consistent with zoning for the area as well as the East 14th Street South Area <br />Development Strategy <br />• No variance is anticipated <br />Environmental Review <br />• The project is categorically exempt <br />Code Compliance Review <br />• A City of San Leandro Building Permit will be obtained for this work <br />• An Encroachment Permit was obtained for work on East 14th Street within the Caltrans <br />right-of--way <br />• A permit has been obtained from the Alameda County Flood Control for connection to its <br />storm drain <br />
The URL can be used to link to this page
Your browser does not support the video tag.