Laserfiche WebLink
will be permitted without written justification being provided by Siemens that the <br />substitutions or replacements are necessary due to the unavailability of the materials and that <br />the replacement materials are shown to be of equal or better quality. Requests for <br />substitution or replacement are subject to review and approval by the City. <br />5. Proiect Management <br />Siemens shall provide all project management service necessary to ensure a complete and <br />operational project while coordinating specification, schedule, and activities of all <br />subcontractors. During the course of construction and commissioning, Siemens shall <br />coordinate with the City on all construction activities. Siemens shall communicate with the <br />City and plan accordingly for shutdown of existing systems for tie-ins of new systems. <br />Siemens shall provide the City with progress updates on a monthly basis <br />6. Commissioning/Performance Assurance <br />Siemens shall provide the following: <br />1) Provide commissioning services to ensure proper operation and sequence of <br />system per design specifications; <br />2) Coordinate check out procedure for each major system to ensure quality control <br />and proper operation; <br />3) Conduct measurements and analyses to verify system performance. <br />4) Provide documentation and reporting to summarize performance assurance <br />validation information; <br />5) Provide an Operation and Maintenance manual for all system components; <br />6) Provide 16 hours of on-site training to City staff on system prior to Acceptance. <br />7. Proiect Schematics <br />Please see attached San Leandro Water Pollution Control Plant Construction <br />Schematics: <br />a) Thermal Flow Diagram <br />b) Grease Holding Tank <br />c) Grease Truck Unloading Area <br />WPCP Cogeneration 090808 -Page 36 of 60 <br />