My WebLink
|
Help
|
About
|
Sign Out
Home
Agmt 2008 Siemens Building Technologies Inc
CityHall
>
City Clerk
>
City Council
>
Agreements
>
2008
>
Agmt 2008 Siemens Building Technologies Inc
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/27/2009 12:25:35 PM
Creation date
9/22/2008 3:08:04 PM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Agreement
Document Date (6)
9/15/2008
Retention
PERM
Document Relationships
_CC Agenda 2008 0915
(Reference)
Path:
\City Clerk\City Council\Agenda Packets\2008\Packet 2008 0915
Reso 2008-114
(Approved by)
Path:
\City Clerk\City Council\Resolutions\2008
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
60
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
will be permitted without written justification being provided by Siemens that the <br />substitutions or replacements are necessary due to the unavailability of the materials and that <br />the replacement materials are shown to be of equal or better quality. Requests for <br />substitution or replacement are subject to review and approval by the City. <br />5. Proiect Management <br />Siemens shall provide all project management service necessary to ensure a complete and <br />operational project while coordinating specification, schedule, and activities of all <br />subcontractors. During the course of construction and commissioning, Siemens shall <br />coordinate with the City on all construction activities. Siemens shall communicate with the <br />City and plan accordingly for shutdown of existing systems for tie-ins of new systems. <br />Siemens shall provide the City with progress updates on a monthly basis <br />6. Commissioning/Performance Assurance <br />Siemens shall provide the following: <br />1) Provide commissioning services to ensure proper operation and sequence of <br />system per design specifications; <br />2) Coordinate check out procedure for each major system to ensure quality control <br />and proper operation; <br />3) Conduct measurements and analyses to verify system performance. <br />4) Provide documentation and reporting to summarize performance assurance <br />validation information; <br />5) Provide an Operation and Maintenance manual for all system components; <br />6) Provide 16 hours of on-site training to City staff on system prior to Acceptance. <br />7. Proiect Schematics <br />Please see attached San Leandro Water Pollution Control Plant Construction <br />Schematics: <br />a) Thermal Flow Diagram <br />b) Grease Holding Tank <br />c) Grease Truck Unloading Area <br />WPCP Cogeneration 090808 -Page 36 of 60 <br />
The URL can be used to link to this page
Your browser does not support the video tag.