My WebLink
|
Help
|
About
|
Sign Out
Home
8E Consent 2008 1103
CityHall
>
City Clerk
>
City Council
>
Agenda Packets
>
2008
>
Packet 2008 1103
>
8E Consent 2008 1103
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/31/2008 10:21:00 AM
Creation date
10/31/2008 10:20:59 AM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Staff Report
Document Date (6)
11/3/2008
Retention
PERM
Document Relationships
_CC Agenda 2008 1103
(Reference)
Path:
\City Clerk\City Council\Agenda Packets\2008\Packet 2008 1103
Reso 2008-137
(Reference)
Path:
\City Clerk\City Council\Resolutions\2008
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
49
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
For the selected preferred building alternative, BTA shall evaluate seismic upgrade needs of the existing <br />Administration Control Building, if needed. <br />Information and/or Services Provided by City: <br />• Available record drawings and specifications of past WPCP designs. <br />• Input on building spatial needs. <br />• Input on sustainable design criteria for LEED Silver certification. <br />• Input on configuration of building layout alternatives. <br />Consultant Deliverables: <br />• Summary table of space needs assessment analysis, <br />• Summary list of sustainable design concepts and preliminary LEED credits assessment. <br />• Summary list of code compliance analysis. <br />• Summary table of alternative comparison. <br />• Summary table of cost of alternatives. <br />• Draft TM (5 hard copies). <br />Task 1.14 -Preliminary Site Plan and Construction Cost Estimate. Consultant shall prepare a TM that <br />includes a preliminary site plan to show the layout of the proposed facilities included on this project. <br />Landscaping of unused areas at the existing Administration Control Building, existing sludge lagoons, area <br />around the new headworks and influent pump station, and the Davis Street frontage area will be evaluated <br />for planting, concrete, gravel, and/or asphalt paving. <br />The site plan will also identify locations where future facilities could be located to meet future regulations for <br />nitrogen and mercury. <br />The TM will also summarize the preliminary construction cost estimate of this project. The TM will include a <br />preliminary general construction sequencing diagram for cost estimating purposes and discuss the basis of <br />the cost estimating methodology. <br />Information and/or Services Provided by City: <br />• Available record drawings and specifications of past WPCP designs. <br />• General input on potential future regulations that could apply to the WPCP. <br />• Input on the anticipated time frame to begin construction of this project. <br />Consulting Services Agreement between Project No. 08-593-52-239 <br />City of San Leandro and Carollo Engineers, Inc. Page 25 <br />
The URL can be used to link to this page
Your browser does not support the video tag.