My WebLink
|
Help
|
About
|
Sign Out
Home
8E Consent 2008 1103
CityHall
>
City Clerk
>
City Council
>
Agenda Packets
>
2008
>
Packet 2008 1103
>
8E Consent 2008 1103
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/31/2008 10:21:00 AM
Creation date
10/31/2008 10:20:59 AM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Staff Report
Document Date (6)
11/3/2008
Retention
PERM
Document Relationships
_CC Agenda 2008 1103
(Reference)
Path:
\City Clerk\City Council\Agenda Packets\2008\Packet 2008 1103
Reso 2008-137
(Reference)
Path:
\City Clerk\City Council\Resolutions\2008
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
49
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• Input on proposed cost estimating methology. <br />• Communications with the Regional Water Quality Control Board for future planning purposes. <br />Consultant Deliverables: <br />• Meeting minutes for the RWQCB meeting. <br />• Figure showing layout of future facilities. <br />• Figures or sketches showing proposed landscaping means. <br />• Preliminary general construction sequencing diagram. <br />• Summary table of preliminary cost estimate for project. <br />• Draft TM (5 hard copies). <br />Task 1.15 -Predesign Report. Consultant shall incorporate applicable City and plant staff comments <br />concerning the draft TMs and prepare the final TMs for inclusion into a Final Predesign Report. The Report <br />will include an Executive Summary TM that summarizes the key findings and conclusions of the various <br />final TMs on this project. <br />Information and/or Services Provided by City: <br />• Review comments for draft TMs. <br />• Review comments for draft Executive Summary. <br />Consultant Deliverables: <br />• Final Predesign Report, including an Executive Summary (5 hard copies in 3-ring binders and one <br />electronic copy in PDF format). The report will include all preferred alternatives, preliminary site <br />plan, and support information. <br />Task 2 -Final Design <br />Consultant shall perform final design of the project elements outlined herein based on Consultant's current <br />understanding of the project, pending the recommendations of the Predesign Report. Final design will <br />include preparation of biddable construction Drawings and Specifications, progress submittals, in-house <br />quality checking, construction cost estimates, and a preliminary construction schedule. <br />Task 2.1 -Quality Control Review. Consultant shalt perform in-house peer review of final design <br />deliverables before submitting them to the City. The key deliverables that will be peer reviewed by the <br />Consultant's Quality Management Team include the 50 percent, 90 percent, and 100 percent submittals, <br />Consulting Services Agreement between Project No, 08-593-52-239 <br />City of San Leandro and Carollo Engineers, Inc. Page 26 <br />
The URL can be used to link to this page
Your browser does not support the video tag.