My WebLink
|
Help
|
About
|
Sign Out
Home
8E Consent 2008 1103
CityHall
>
City Clerk
>
City Council
>
Agenda Packets
>
2008
>
Packet 2008 1103
>
8E Consent 2008 1103
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/31/2008 10:21:00 AM
Creation date
10/31/2008 10:20:59 AM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Staff Report
Document Date (6)
11/3/2008
Retention
PERM
Document Relationships
_CC Agenda 2008 1103
(Reference)
Path:
\City Clerk\City Council\Agenda Packets\2008\Packet 2008 1103
Reso 2008-137
(Reference)
Path:
\City Clerk\City Council\Resolutions\2008
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
49
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• Supporting documentation concerning the project for City staff to prepare the application for City <br />Building permit. <br />• Documentation from City fire marshal on fire protection design requirements. <br />• Completed Permit to Construct application for City to submit to BAAQMD for new unit process <br />emissions. <br />• Completed permit application for City to submit to PG&E for service load addition. <br />• Five (5) paper copies of the 50 percent submittal (half-size drawings and specifications). <br />• Five (5) paper copies of the 90 percent submittal (half-size drawings and specifications). <br />• Five (5) paper copies of the 100 percent submittal (half-size drawings and specifications). <br />• Construction cost estimates at the 50, 90 and 100 percent submittal stages (two weeks after each <br />submittal). <br />• Preliminary construction sequencing diagram (two weeks after the 90 percent submittal). <br />• Preliminary construction schedule (four weeks after the 90 percent submittal). <br />• One photo-ready set of electronically-signed Bid Documents (full-size drawings and specifications) <br />for reproduction by the City. <br />• One electronic copy of electronically-signed Bid Documents (drawings in AutoCAD DWG format <br />and specifications in MS WORD format). <br />Task 3 -Bid Period Services <br />The City will lead the bid period services and print and distribute bid documents and addendums, conduct <br />the pre-bid conference, and tabulate and review the bids. Consultant shall provide as-requested assistance <br />during the bid period (approximately 3 months between advertisement and receipt of bids). For this task, a <br />budget allowance of 100 hours is included for this work. <br />Information and/or Services Provided by City: <br />• Advertise, print, sell, and distribute bid packages to bidders. <br />• Prepare, print, and distribute addenda to bidders. <br />Consulting Services Agreement between Project No. 08-593-52-239 <br />City of San Leandro and Carollo Engineers, Inc. Page 31 <br />
The URL can be used to link to this page
Your browser does not support the video tag.