My WebLink
|
Help
|
About
|
Sign Out
Home
Agmt 2008 Carollo Engineers Inc
CityHall
>
City Clerk
>
City Council
>
Agreements
>
2008
>
Agmt 2008 Carollo Engineers Inc
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/18/2008 3:37:41 PM
Creation date
11/18/2008 3:29:58 PM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Agreement
Document Date (6)
11/3/2008
Retention
PERM
Document Relationships
_CC Agenda 2008 1103
(Reference)
Path:
\City Clerk\City Council\Agenda Packets\2008\Packet 2008 1103
Reso 2008-137
(Approved by)
Path:
\City Clerk\City Council\Resolutions\2008
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
45
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Consultant Deliverables: <br />• Drilling permit from Alameda County to conduct borings. <br />• Backfilling of borings with grout in accordance with Alameda County requirements. <br />• Draft and final geotechnical reports (Note that the draft geotechnical will initially be prepared for <br />City comments and for use in predesign and final design. The final geotechnical report will not be <br />completed until the end of final design to allow for on-going updates to the report between <br />predesign and final design). <br />Task 1.3 -Underground Utility Mapping. Exaro Technologies Corporation (Exaro), a subconsultant to <br />Carollo, shall perform underground utility mapping of the WPCP by performing electronic detection followed <br />by ground penetrating radar to locate elevation and layout of underground utilities. For budgeting purposes, <br />Exaro shall perform underground utility mapping work at the plant site for an area that encompasses <br />approximately 120,000 square feet at the direction of the Consultant. After this is completed, Exaro shall <br />perform in continuous fashion potholing using vacuum excavation methods for up to 10 pothholes or <br />perform slot trenches (approximately 1-feet by 8-feet) to check location and/or size of the observed <br />underground utilities in support of the project. <br />Information and/or Services Provided by City: <br />• Available record drawings and specifications of past WPCP designs. <br />• Input on general location, type, number, and size of underground utilities in congested areas of the <br />WPCP. <br />Consultant Deliverables: <br />• A figure or map identifying approximate locations and elevations of underground utilities at select <br />areas of the WPCP to be inputted by the Consultant, <br />• A summary table showing location and/or size of the underground utilities observed during the <br />potholing process. <br />Task 1.4 -Aerial Topographic Surveying. Towill, Inc. (Towill), a subconsultant to Carollo, shall prepare a <br />digital planimetric/topographic map of the WPCP areas shown in Attachment A to serve as the base maps <br />for predesign and final design. This map also shows the anticipated "limit of work" for the project. Ground <br />control surveys will be performed and temporary benchmarks will be established at the WPCP. Mapping <br />will be performed based on the specified horizontal and vertical datum selected by the City, As part of this <br />task, Towill shall also perform as-needed field surveying at the WPCP to verify vertical locations and <br />elevations of existing structures for this project. <br />Information and/or Services Provided by City: <br />Consulting Services Agreement between Project No. 08-593-52-239 <br />City of San Leandro and Carollo Engineers, Inc. Page 18 <br />
The URL can be used to link to this page
Your browser does not support the video tag.