My WebLink
|
Help
|
About
|
Sign Out
Home
Agmt 2008 Carollo Engineers Inc
CityHall
>
City Clerk
>
City Council
>
Agreements
>
2008
>
Agmt 2008 Carollo Engineers Inc
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/18/2008 3:37:41 PM
Creation date
11/18/2008 3:29:58 PM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Agreement
Document Date (6)
11/3/2008
Retention
PERM
Document Relationships
_CC Agenda 2008 1103
(Reference)
Path:
\City Clerk\City Council\Agenda Packets\2008\Packet 2008 1103
Reso 2008-137
(Approved by)
Path:
\City Clerk\City Council\Resolutions\2008
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
45
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• Available record drawings and specifications of past WPCP designs. <br />• Input on horizontal and vertical datum to be used for mapping. <br />Consultant Deliverables: <br />• CD of the aerial mapping electronic files in CAD format. <br />Task 1.5 -Environmental Documentation Support. The City anticipates that preparation of a <br />Categorical Exemption will be satisfactory to comply with the California Environmental Quality Act. The City <br />will take the lead in preparing the Categorical Exemption. For budgeting purposes, 40 labor hours of <br />Consultant's time is assumed to provide as-requested support to the City in preparing the Categorical <br />Exemption. <br />Information and/or Services Provided by City: <br />• Preparation of the Categorical Exemption. <br />• Questions for Consultant related to the Categorical Exemption. <br />Consultant Deliverables: <br />• Responses to City questions. <br />Task 1.6 -Flow and Loads Evaluation. Consultant shall prepare a technical memorandum (TM) to <br />evaluate and recommend the design flow and loads to be used for design of this project. Consultant shall <br />review three (3) years of plant operations data between January 2005 and December 2007 to evaluate <br />average dry weather and maximum month flows, influent concentrations and loadings for total suspended <br />solids and biochemical oxygen demand, and peak flow and load ratios. The Consultant will also review <br />information on current industrial dischargers and anticipated future contributions, including but not limited <br />to, the Kaiser Permanente and Transit Oriented Development (TOD) projects. <br />Information and/or Services Provided by City: <br />• Plant operations data between January 2005 and December 2007. <br />• Input on current influent flow and constituent sampling locations. <br />• Current service area population and future design or buildout population. <br />• Occupancy, flow, and loading information on current industrial dischargers and anticipated future <br />industrial contribution (including Kaiser and TOD Projects). <br />Consultant Deliverables: <br />• Graphs of historical flow and load data. <br />Consulting Services Agreement between Project No. 08-593-52-239 <br />City of San Leandro and Carollo Engineers, Inc. Page 19 <br />
The URL can be used to link to this page
Your browser does not support the video tag.