Laserfiche WebLink
• Available record drawings and specifications of past WPCP designs. <br />• Input on horizontal and vertical datum to be used for mapping. <br />Consultant Deliverables: <br />• CD of the aerial mapping electronic files in CAD format. <br />Task 1.5 -Environmental Documentation Support. The City anticipates that preparation of a <br />Categorical Exemption will be satisfactory to comply with the California Environmental Quality Act. The City <br />will take the lead in preparing the Categorical Exemption. For budgeting purposes, 40 labor hours of <br />Consultant's time is assumed to provide as-requested support to the City in preparing the Categorical <br />Exemption. <br />Information and/or Services Provided by City: <br />• Preparation of the Categorical Exemption. <br />• Questions for Consultant related to the Categorical Exemption. <br />Consultant Deliverables: <br />• Responses to City questions. <br />Task 1.6 -Flow and Loads Evaluation. Consultant shall prepare a technical memorandum (TM) to <br />evaluate and recommend the design flow and loads to be used for design of this project. Consultant shall <br />review three (3) years of plant operations data between January 2005 and December 2007 to evaluate <br />average dry weather and maximum month flows, influent concentrations and loadings for total suspended <br />solids and biochemical oxygen demand, and peak flow and load ratios. The Consultant will also review <br />information on current industrial dischargers and anticipated future contributions, including but not limited <br />to, the Kaiser Permanente and Transit Oriented Development (TOD) projects. <br />Information and/or Services Provided by City: <br />• Plant operations data between January 2005 and December 2007. <br />• Input on current influent flow and constituent sampling locations. <br />• Current service area population and future design or buildout population. <br />• Occupancy, flow, and loading information on current industrial dischargers and anticipated future <br />industrial contribution (including Kaiser and TOD Projects). <br />Consultant Deliverables: <br />• Graphs of historical flow and load data. <br />Consulting Services Agreement between Project No. 08-593-52-239 <br />City of San Leandro and Carollo Engineers, Inc. Page 19 <br />