Laserfiche WebLink
ENGINEER'S COST OPINION <br />FOR <br />Dog Park Feasibility Study <br />Option #1 - 4" Thick by 3' Perimeter DG <br />ITEM DESCRIPTION QUANTITY UNIT UNIT PRICE AMOUNT <br />1 Mobilization 1 LS $30,0t70.U0 $30,000.00 <br />*2 Scrub & Regrade w/ AB Access Road 2I 5 CY $114.00 $23,650.00 <br />**3 Decomposed Granite 472 SY $26.00 $12,272.00 <br />4 Install Fencing with Gates 855 LF $42.00 $35,910.00 <br />5 Benches with Concrete Pad 8 EA $754.00 $6,0(}0.(10 <br />6 Shade Structure Concrete Pad 540 SF $] 5.00 $7,500.00 <br />7 Shade Structure (Galvanized Steel} 1 EA $22,500.00 $22,500.00 <br />8 Message Board (Galvanized Steel} ] EA $5,70(1.00 $5,740.t~0 <br />9 EBMUD connection 1 LS S 16,8 ] 3.00 $16,$13.00 <br />10 Water Service Line 225 LF $50.00 $11,254.00 <br />L l Backflow Prcvcntcr Assembly 1 EA $2,000.00 $2,000.00 <br />12 Water Fountain Installation 2 EA $5,400.00 $]0,004.00 <br />13 Pet Station Trash Reeeptable 1 BA 5500.00 $500.(10 <br />l4 French Drain 80 LF $40.00 $3,204.[10 <br />l5 Clearing and Grubing 1 Rough Grading I LS $8,500.00 $S,S00.[10 <br />16 Fine Grading I LS $5,000.00 $5,004.04 <br />SUBTOTAL CONSTRUCTION 5200,795.04 <br />Permit Fees, Utility Gosts, other Misc Fees {Incl. BCDC) .......................... $1,150.00 <br />Contingencies .................................................. Percentage: 25°lu 50,198.75 <br />Desitn ..................................................................................... 30 pOO.t?0 <br />Construction En~ineerine. lnnnection & Admin .......................................... 30.000.00 <br />BUDGET INFORMATION Account Number s Amount <br />Designated Funds Available: TBD <br />TOTAL FUNDING SD.ai <br />By: Amit Salwan Datc Prepared: 19-Au -08 <br />Cost Estimate Purpose: Conce foal <br />Reviewed: Date: <br />Austine Osakwe, P.E., Senior Engineer <br />Approved: Date: <br />Kenneth Joseph, P.E., City Engineer <br />set's Cost Estimate D6-1D.xls 1012../2(108 <br />