My WebLink
|
Help
|
About
|
Sign Out
Home
Airport Highlights 2009 0306
CityHall
>
City Clerk
>
City Council
>
Committees
>
Airport Committee
>
Airport Highlights 2009 0306
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/16/2009 2:18:53 PM
Creation date
3/16/2009 2:16:20 PM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Committee Highlights
Document Date (6)
3/6/2009
Retention
PERM
Document Relationships
_CC Agenda 2009 0316
(Reference)
Path:
\City Clerk\City Council\Agenda Packets\2009\Packet 2009 0316
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
30
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 3 of 3 <br />Tentative Schedule for Phase II <br />March - Hazmat Sampling and testing will take place the Asbestos and Lead Work Plan will be <br />incorporated into spec books upon completion. <br />Acoustical Testing -Plans have been reviewed and recommendations for test homes were <br />supplied to acoustical engineer on February 9. <br />April -Pre-Bid Conference will be held and GE Chen Construction will be given copies of <br />the project manual and the specifications. Adate will be set when they must submit their <br />project costs for City approval. <br />Pre-construction Conference to be held at the end of April or early May after the City <br />approves GE's cost proposal. All the local, state and federal requirements will be reviewed <br />at this meeting. Issues that were brought up in previous phases will be discussed. <br />May -Contractor Verification of Measurements to take place and RFIs will be submitted and <br />answered in a timely manner so the materials can be ordered. <br />All construction submittals will be reviewed and approved. <br />June /July -the lead time for fabrication of acoustical windows and doors is approximately 8 <br />weeks for vinyl and 12 weeks for aluminum. <br />August -Materials Inspection will be held after the components are delivered to the contractor's <br />warehouse. <br />Construction -depending on size, one or two homes will be opened per day. All 75 homes <br />should be opened and substantially complete 8 - 9 weeks from the start of construction. <br />Phase III Solicitation <br />56 CNEL -119 letters are being sent to homes that have not participated or responded to date. <br />The intent is to recruit the participation of as many properties in the 56 CNEL before including <br />homes in the 53, 54 & 55 CNEL. Many of the homeowners in the lower noise impacted area have <br />sent in Interest in Participation forms and call for a status update regularly. <br />If you have any questions or would like more information, please call me. <br />Regards, <br />C. Kell-Smith & Associates, Inc. <br />Anna Wlasiuk <br />Aircraft Noise Insulation Projects • Program Management • Administrative Services <br />