Laserfiche WebLink
SAN LEANDRO ADMINISTRATIVE CODE <br />FINANCE <br />TITLE 6, Chapter 4 <br />FEES <br />§ 6.4.100: FEES. The following fees have been established by the City Council pursuant to various provisions of the San Leandro Municipal Code (SLMC), San Leandro Administrative Code (SLAC) or the general laws of the State of California. <br />Description <br />Current Fee Reference <br />3 Electrical Permit <br />A. Filing and Issuance <br />$86 plus the amount shown below for each <br />electrical item <br />B. Plan -Check, when applicable <br />Direct Cost (1) <br />For new Residential Construction and additions with valuations over $100,000 <br />included all circuits service and sub panels. <br />13% of building permit fees <br />Circuits: Installation, replacement or alteration of each electrical circuit (includes related outlets, switches, receptacle and lighting fixtures): <br />15 to 20 ampere circuit <br />$9.30 <br />21 to 30 ampere circuit <br />$10.10 <br />31 to 40 ampere circuit <br />$10.40 <br />41 to 50 ampere circuit <br />$11.15 <br />51 to 70 ampere circuit <br />$12.00 <br />71 to 100 ampere circuit <br />$15.20 <br />101 to 200 ampere circuit <br />$22.00 <br />Over 200 ampere capacity <br />$22.35 PLUS $6.65 for each additional 100 ampere <br />capacity or fraction thereof <br />Trolley and plug-in type bus -ways, per linear foot <br />$0.55 <br />Lighting fixtures, brackets, pendants, cord drops, outlets, receptacles, switches <br />and other lamp holding devices each on existing circuits <br />$1.10 <br />Multi -outlet assemblies, light tracts, per linear foot <br />$0.80 <br />Temporary power service pole or pedestal, each <br />$27.10 <br />Temporary distribution system (for construction sites, Xmas tree lots, etc.), each $27.10 <br />Service or Service Change: <br />Services over 600 volts: <br />Up to 200 amp, each <br />$95.85 <br />Over 200 amp, each <br />$95.85 <br />Services 600 volts or less, each <br />Up to 200 amp capacity <br />$32.95 <br />Over 200 amp capacity <br />$66.10 <br />Service disconnecting means for additional meter <br />$5.05 up to a maximum of $76.75 each <br />(1) IDIrect Coat = hourly personnel charge plus a factor of 100% for fringe banefks, overhand and Indirect coats <br />GAFEE312009-10 Fass\2000-10 Adopted Fees 7 5/15/2000 <br />