My WebLink
|
Help
|
About
|
Sign Out
Home
Agmt 2009 Kimley-Horn & Associates Inc
CityHall
>
City Clerk
>
City Council
>
Agreements
>
2009
>
Agmt 2009 Kimley-Horn & Associates Inc
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/17/2009 12:24:46 PM
Creation date
6/17/2009 12:24:44 PM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Agreement
Document Date (6)
6/15/2009
Retention
PERM
Document Relationships
Reso 2009-084
(Approved by)
Path:
\City Clerk\City Council\Resolutions\2009
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
38
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City in Task 4.1.1 with agreed upon modifications. The plan sheets will be 24 inch by 36 inch <br />(24 x 36) and will generally be 1 inch=20 feet or a scale that will adequately convey the <br />information required with details generally at 1 inch=l0 feet. <br />We will complete the plans up to 35% only, but some plan sheets will be placeholders far the <br />65% to 75% design phase. It is anticipated that the 35% improvement plan set will consist of the <br />following sheets: <br />• Title (1): Project information, vicinity map, location map, sheet index and contact information. <br />• Notes (1): Standard City and Engineer's notes, legend, and abbreviations. <br />• Sections and Details (1): Typical roadway sections, sheet layouts, and details for work described <br />on the plans. <br />• Demolition (2): Items to be removed or protected. <br />• Plan Sheets (4): Horizontal and vertical information for the surface improvements. <br />• Traffic Signals ($): Three signal modifications and one new signalized intersection with <br />appropriate equipment and conductor schedules (conductor schedule not completed at 35%). <br />• Street Lighting (2): Electrolier, conduit, and pull box locations with conductor information and <br />details (electrolier locations only shown at 35%). <br />• Signing and Pavement Marking (2): Installation, relocation and/or removal of signs and pavement <br />markings. <br />Based on input received on the Conceptual Design, preliminary concepts will be prepared for the <br />streetscape design. The preliminary streetscape design will consist of the following: <br />• Tree type and location, including a list of appropriate species. <br />• Other planting type and location, if appropriate to the design concept. <br />• Street and pedestrian lighting type and location (Photometric studies are not included in this <br />scope of services but can be provided by a street light/electrical consultant with additional <br />authorization if desired). <br />• Street furnishings location, size and appearance (Furnishings will include seating, trash <br />receptacles, newspaper stands, bicycle racks, tree grates and guards, bollards and transit <br />shelters [in consultation with AC TransitJ). <br />• Preliminary schedule of materials, textures, colors and shapes for paving surfaces and elements. <br />• Opportunities for public art, considering locations such as sidewalks, benches, trash receptacles, <br />banner and transit shelters. <br />• An engineer's opinion of probable costs will be prepared. <br />Additional sheets that maybe needed for the complete construction document but will NOT be <br />included in the 35% plan set are: <br />• Erosion Control (2): Erosion control details and locations of erosion control to be addressed <br />during construction. <br />• Permanent NPDES features (3): Storm drain items to clean water in the system. <br />• Construction Phasing (5): Anticipated phasing of construction per Caltrans Standards. <br />San Leandro Blvd-BART Interface Plan June, 2009 <br />28 of 38 <br />
The URL can be used to link to this page
Your browser does not support the video tag.