Laserfiche WebLink
San Leandro Boulevard Preliminary Engineering Design (see Task 4.1 for <br />description of plan sheets) (25 bound 11x17 sets) <br />Meetings: City Council Public Hearing: Adoption of Final San Leandro Boulevard-BART <br />Pedestrian Interface Plan <br />Please refer to Task 1 for staff meetings <br />Information Provided By Client, Agency, or Others <br />• List of planned, funded transportation improvements. <br />• List of planned and approved development projects. <br />• Relevant traffic studies for nearby projects. <br />• Traffic counts for study area intersections. <br />• Existing AM/PM peak hour traffic counts at study area intersections. <br />• Arrange and organize community meetings (to be facilitated by consultant team). <br />• As-built roadway and utility plans for San Leandro Boulevard and the cross streets. <br />• As-built traffic signal plans available for the project area. <br />• Benchmark and monumentation information (benchmark records available on-line). <br />• Topographical survey information appropriate for design. <br />• Sample plans and specifications. <br />• Any hydrology/hydraulic reports available for the project area. <br />• Any utility master plans available for the project area. <br />• Any geotechnical reparts available for the project area. <br />• Contact lists for the utilities within the project limits. <br />• City Standards (available on-line). <br />6. ADDITIONAL SERVICES <br />6.1 Services Not Included <br />Any other services, including but not limited to the following, are not included in this <br />Agreement. <br />• Analysis of alternative site plans or additional intersections /driveways. <br />• Analysis of alternative time periods. <br />• Prepare Environmental Impact Report. <br />• Additional meetings and attendance at public meetings not included in the scope. <br />6.2 Additional Services <br />Any services not specifically provided for in the above scope, as well as any changes in the <br />scope the Client requests, will be considered additional services and will be performed at our <br />then current hourly rates. <br />San Leandro Blvd-BART Interface Plan June, 2009 <br />32 of 38 <br />