My WebLink
|
Help
|
About
|
Sign Out
Home
Agmt 2009 Kimley-Horn & Associates Inc
CityHall
>
City Clerk
>
City Council
>
Agreements
>
2009
>
Agmt 2009 Kimley-Horn & Associates Inc
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/17/2009 12:24:46 PM
Creation date
6/17/2009 12:24:44 PM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Agreement
Document Date (6)
6/15/2009
Retention
PERM
Document Relationships
Reso 2009-084
(Approved by)
Path:
\City Clerk\City Council\Resolutions\2009
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
38
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
San Leandro Boulevard Preliminary Engineering Design (see Task 4.1 for <br />description of plan sheets) (25 bound 11x17 sets) <br />Meetings: City Council Public Hearing: Adoption of Final San Leandro Boulevard-BART <br />Pedestrian Interface Plan <br />Please refer to Task 1 for staff meetings <br />Information Provided By Client, Agency, or Others <br />• List of planned, funded transportation improvements. <br />• List of planned and approved development projects. <br />• Relevant traffic studies for nearby projects. <br />• Traffic counts for study area intersections. <br />• Existing AM/PM peak hour traffic counts at study area intersections. <br />• Arrange and organize community meetings (to be facilitated by consultant team). <br />• As-built roadway and utility plans for San Leandro Boulevard and the cross streets. <br />• As-built traffic signal plans available for the project area. <br />• Benchmark and monumentation information (benchmark records available on-line). <br />• Topographical survey information appropriate for design. <br />• Sample plans and specifications. <br />• Any hydrology/hydraulic reports available for the project area. <br />• Any utility master plans available for the project area. <br />• Any geotechnical reparts available for the project area. <br />• Contact lists for the utilities within the project limits. <br />• City Standards (available on-line). <br />6. ADDITIONAL SERVICES <br />6.1 Services Not Included <br />Any other services, including but not limited to the following, are not included in this <br />Agreement. <br />• Analysis of alternative site plans or additional intersections /driveways. <br />• Analysis of alternative time periods. <br />• Prepare Environmental Impact Report. <br />• Additional meetings and attendance at public meetings not included in the scope. <br />6.2 Additional Services <br />Any services not specifically provided for in the above scope, as well as any changes in the <br />scope the Client requests, will be considered additional services and will be performed at our <br />then current hourly rates. <br />San Leandro Blvd-BART Interface Plan June, 2009 <br />32 of 38 <br />
The URL can be used to link to this page
Your browser does not support the video tag.