Laserfiche WebLink
Schedule: <br />The bulk of the initial schedule is driven by the environmental process and is dependent on <br />review & responses from parties beyond the control of the Consultant and the City. The <br />following schedule is to be used as a guide only and represents the anticipated duration of the <br />various tasks. <br />Memo Evaluation of pipe upgrade alternates & <br />recommendations 6 weeks after receipt of NTP <br />Prepare Biological & Cultural Resources <br />Assessments 6 weeks after receipt of NTP <br />Develop Design to 80% level 4 weeks after City Comments on Pipe Upgrade <br />Memo <br />Pre are CEQA Draft Initial Stud 4 weeks after Com letion of 80%Desi <br />Public review period and Response to <br />Comments 6 weeks after Completion of Draft Initial Study <br />Prepare Final Initial Study/Mitigated Negative <br />Declaration 2 weeks after Response to Comments <br />CDFG 1602 Permit 16 weeks after Com letion of 80%Desi <br />Construction Documents 100% 3 weeks after 1602 Permit <br />Construction Documents Final 3 weeks after Cit Comments <br />Consulting Services Agreement between 593-52-121 <br />City of San Leandro and C+D Infrastructure Engineers Exhibit A Page 19 <br />