Laserfiche WebLink
CORNERSTONE AT SAN LEANDRO CROSSINGS <br />DRAFT MITIGATION MONITORING AND REPORTING PLAN <br />IMPACT <br />MITIGATION MEASURES REQUIRED <br />MONITORING <br />TIMING <br />RESPONSIBILITY <br />Mitigation Measure #27: The proposed project shall implement TOD Strategy <br />City Engineer <br />Prior to Final Map <br />F7 by maximizing on -street parking opportunities on the internal circulation <br />network west of the BART Station (Site 2). This shall include the use of angled <br />parking on appropriate streets. <br />Mitigation Measure #28: The proposed project shall implement TOD Strategy <br />City Engineer <br />Prior to Final Map <br />1`14 by adopting a maximum parking ratio of 1.0 exclusive spaces per dwelling <br />unit plus a maximum parking ratio of 0.5 parking spaces per dwelling unit for flex <br />parking. <br />Mitigation Measure #29: The proposed project shall implement TOD Strategy <br />15 by accommodating visitors through the shared parking supply (on and off- <br />City Engineer <br />Prior to Final Map <br />street) or in the unbundled flex parking supply that is permitted on site. <br />Public Services <br />11 a to e. The project will <br />Mitigation Measure #30: The minimum levels of service standards for police <br />Community Development <br />Prior to Final Map <br />result in substantial physical <br />and fire response times shall be maintained in accordance with General Plan <br />Department <br />impacts associated with new <br />Policy 45.01. <br />or physically altered <br />governmental facilities, the <br />Mitigation Measure #31: The applicant shall incorporate lighting, <br />Community Development <br />Prior to Final Map <br />construction of which could <br />landscaping and other design features that reduce the potential for crime and <br />Department <br />cause significant <br />facilitate rapid response to emergency calls in accordance with General Plan <br />environmental impacts, in <br />Policy 45.06. <br />order to maintain acceptable <br />service ratios, response times <br />Mitigation Measure #32: The applicant shall pay all developer fees required <br />SLUSD and Community <br />Prior to Final Map <br />or other performance <br />by the San Leandro Unified School District at the time of building permits. <br />Development Department <br />objectives for any of the <br />public services. <br />Utilities and Service S stems <br />12 a to b. The project will <br />exceed wastewater treatment <br />Mitigation Measure #33: The applicant shall promote the efficient use of <br />City Engineer <br />Prior to Final Map <br />requirements ofthe RWQCB, <br />existing water supplies through avariety of water conservation measures, <br />require construction of new <br />water or wastewater facilities, <br />including evaluating the potential for the use of recycled water for landscaping <br />storm water drainage facilities <br />in accordance with General Plan Policy 27.02. <br />and result in a determination by <br />the wastewater treatment <br />Mitigation Measure #34: The applicant shall conserve water through the use <br />Chief Building Official <br />Prior to Issuance of <br />provider which serves the project <br />of such measures as low -flow plumbing fixtures and water -saving appliances <br />Building Permit <br />that it has adequate capacity. <br />in accordance with General Plan Policy 27.04. <br />13 <br />