My WebLink
|
Help
|
About
|
Sign Out
Home
3B Public Hearing 2009 0720
CityHall
>
City Clerk
>
City Council
>
Agenda Packets
>
2009
>
Packet 2009 0720
>
3B Public Hearing 2009 0720
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/5/2019 8:29:34 AM
Creation date
7/17/2009 9:57:38 AM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Staff Report
Document Date (6)
7/20/2009
Retention
PERM
Document Relationships
_CC Agenda 2009 0720
(Reference)
Path:
\City Clerk\City Council\Agenda Packets\2009\Packet 2009 0720
MO 2009-036
(Reference)
Path:
\City Clerk\City Council\Minute Orders\2009
Reso 2009-107
(Reference)
Path:
\City Clerk\City Council\Resolutions\2009
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
130
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Vesting Tentative PLN2008-00030 2 July 20, 2009 <br />• The Mitigated Negative Declaration for the Cornerstone and the replacement garage were <br />approved by the Planning Commission on July 9, 2009. <br />• Site Plan Review for the Cornerstone and replacement parking garage was approved by <br />the Planning Commission on July 9, 2009. <br />The Vesting Tentative Map was recommended for approval to the City Council by the Planning <br />Commission on July 9, 2009. <br />BACKGROUND <br />Cornerstone at San Leandro Crossings <br />Cornerstone at San Leandro Crossings is being planned for the BART East Parking Lot located at <br />1400 San Leandro Boulevard also known as "Site 1" on the attached "Masterplan Projects". The <br />development will be a Class A, luxury, multi -family rental community which will be mapped for <br />condominium purposes. The structure will contain 200 homes based with the following unit <br />breakdown: 8 studio units, 95 one bedroom and 97 two bedroom units with an additional 5000 <br />sq. ft of commercial space. The podium level will contain multiple amenities including a two- <br />story club room with a full kitchen, a fitness room with locker room/showers, an outdoor BBQ <br />area and a heated pool, spa and sun deck. <br />Frontages on San Leandro Boulevard, West Juana Avenue and Carpentier Street will have <br />ground floor units with entrances facing the sheet. This pedestrian orientation coupled with <br />extensive new landscaping will make for a strong pedestrian oriented project consistent with the <br />City's TOD Strategy. <br />Replacement Parking Garage <br />The Replacement Parking Garage will be located at the intersection of Parrott Street and <br />Martinez Street and is shown as "Site 2" on the attached Masterplan Projects. The four -level, 339 <br />space parking stricture, will be constructed of concrete, and will include auto and van accessible <br />stalls. The 339 parking spaces will provide 10 spaces more than those currently located on the <br />BART East Parking Lot. <br />A detailed description of the Cornerstone and Replacement Garage is found in the Planning <br />Commission Report (attached). Included in your packet for informational purposes are colored <br />elevations and site plans, the Vesting Tentative Map, and floor plans. <br />Staff recommends that the City Council 1) hear the staff presentation; 2) open the public hearing; <br />3) discuss the material 4) adopt the mitigated negative declaration and mitigation monitoring <br />program, and 4) approve the Vesting Tentative Map subject to the attached Conditions of <br />Approval. <br />
The URL can be used to link to this page
Your browser does not support the video tag.