Laserfiche WebLink
Attachments <br />Figure 1. Location Map <br />Figure 2. Photograph of Site 1 (With Multi -Family Residential Beyond) <br />Figure 3. Photograph of Site 2 (Ptn of 1333 Martinez Street) <br />Sources <br />1. Westlake Development Partners, LLC, Project Description, February 2, 2009. <br />2. Field Inspection, Planning Staff, City of San Leandro, February 4, 2009. <br />3. City of San Leandro General Plan, Adopted May 2002. <br />4. Design, Community and Environment, Downtown San Leandro Transit Oriented Development (TOD) <br />Strategy EIR, Prepared for City of San Leandro, June 5, 2007. <br />5. Final Geotechnical Investigation San Leandro Crossings Development, Rockridge Geotechnical, <br />January 21, 2009. <br />6. State of California Seismic Hazard Zones, San Leandro Quadrangle, February 14, 2003. <br />7. California Geological Survey, Special Publication 117: Guidelines for Evaluating and Mitigating <br />Seismic Hazards in California, Adopted March 13, 1997 by the State Mining and Geology Board in <br />Accordance with the Seismic Hazards Mapping Act of 1990. <br />8. Stormwater Control Plan for San Leandro Crossings, Prepared by Lea & Braze Engineering, Inc. <br />September 25, 2008. <br />9. San Leandro General Plan Update Draft Environmental Impact Report, Prepared by Barry Miller, <br />AICP, November 2001. <br />10, Phase I Environmental Site Assessment Report for 1333 Martinez Street, Prepared by Stantec Consulting <br />Corporation, August 12, 2008. <br />11. Phase I Environmental Site Assessment Report for Northeast Corner of San Leandro Boulevard, <br />Prepared by Stantec Consulting Corporation, October 20, 2008. <br />12. Phase H Environmental Site Assessment for San Leandro Crossings Eastern Parcel, Prepared by TRIS <br />Environmental, January 6, 2009. <br />Cornerstone at San Leandro Crossings Initial Study 31 March 2009 <br />