The task list and schedule will updated on a monthly basis and submitted with <br />Project Progress Report. <br />Consultant shall assist the City and their design consultant in coordinating <br />meetings and by attending project meetings with the necessary agencies. <br />Consultant shall also assist in the preparation and distribution of meeting minutes, <br />and associated tasks required to maintain the project schedule. Consultant should <br />assume their attendance will be required at a minimum of 12 meetings: 3 project <br />permitting and design meetings with City and consultants, 3 meetings with <br />regulatory agencies, Pre-Bid Meeting (City), Pre-Construction Conference (City), <br />and 4 project regulatory compliance meetings during construction. <br />6. Task 6 -Provide Pre-Dredging Notifications <br />Consultant shall assist the City in preparing the necessary notifications for BCDC, <br />Corps, and any other resource agencies, including all required attachments. For <br />BCDC, a brief letter indicating the expected start date and anticipated duration of <br />the dredging is anticipated to be sufficient. <br />7. Task 7 -Monitor Ongoing Dredging Operations <br />Consultant shall monitor the DMMS on a twice a week basis for the City's <br />dredging of the berths. It is anticipated that the actual days of field <br />reconnaissance will vary from week to week to insure objectivity in the <br />compliance monitoring. Consultant should assume an average of a half-day per <br />field reconnaissance. The Project Director will monitor the operation at least <br />once weekly (project duration estimated at 12 weeks), with additional monitoring <br />provided by an associate as assigned by the Director. At the end of each week, <br />Consultant shall submit to the City a completed checklist of observations made <br />during that week. A sample checklist will be prepared at project initiation and <br />submitted to the Engineer for review and comment prior to its use during the <br />monitoring operations. <br />This cost to complete this task shown in Exhibit B is preliminary and excludes the <br />cost of required decant and/or receiving water sampling and analysis for the <br />City's dredging project. Once the final permitting requirements of the DMMO <br />agencies are known, Consultant shall submit a revised cost estimate to the <br />Engineer for approval. <br />8. Task 8 -Provide Post-Dredging Notifications <br />Consultant shall provide the necessary post-dredging reports and notifications to <br />the applicable regulatory agencies, including BCDC and the Corps. These <br />reports/notifications will be prepared in draft form for review by the City prior to <br />formal submittal to the pertinent agencies. <br />9. Task 9 - Corp's Channel Dredging <br />Consultant shall assist the City as needed in the coordination Corp's dredging <br />San Leandro Marina Channel and Berth Dredging July 21, 2005 <br />597-57-200 Page 17 of 21 <br />