Laserfiche WebLink
EXHIBIT B <br />COMPENSATION SCHEDULE AND HOURLY FEES <br />B-1 Fees <br />All work will be billed on aTime-and-Materials, Not-to-Exceed basis. The following <br />limits shall not be exceeded without prior authorization by City: <br />Task 1 -Coordination and Data Gathering $8,000.00 <br />Task 2 -Design Services $46,000.00 <br />Reimbursable Expenses $1,000.00 <br />Total $55,000.00 <br />Note: The optional scope of work under Task 3 (Bidding & Construction) is not included <br />in this agreement at this time. <br />B-2 Hourly Fees Schedule for Consultant's Staff <br />Concept Marine Associates, Inc. <br />FEE SCHEDULE <br />(Effective January 1, 2005) <br />Professional and Technical Personnel Classifications <br />Principal Project Manager $175.00 <br />Principal Engineer $160.00 <br />Senior Project Manager $149.00 <br />Area Construction Manager $134.00 <br />Senior Construction Manager $129.00 <br />Project Manager /Senior Engineer $118.00 <br />Construction Manager /Resident Engineer $99.00 <br />Project Engineer $93.00 <br />Cost Estimator $93.00 <br />Senior Planner /Permit Specialist $93.00 <br />Senior CADD Drafter $90.00 <br />Staff Engineer $84.00 <br />Webmaster $82.00 <br />CADD Operator /Drafter $79.00 <br />Asst. CM /Field Engineer $57.00 - $77.00 <br />Inspector $64.00 - $108.00 <br />Clerical /Document Control $40 - $60.00 <br />San Leandro Marina Channel and Berth Dredging 2006 July 22, 2005 <br />597-57-200-5120 Page 19 of 21 <br />