My WebLink
|
Help
|
About
|
Sign Out
Home
Reso 2004-037
CityHall
>
City Clerk
>
City Council
>
Resolutions
>
2004
>
Reso 2004-037
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/12/2009 11:34:01 AM
Creation date
8/7/2009 12:55:30 PM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Resolution
Document Date (6)
4/12/2004
Retention
PERM
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
POTENTIALLY <br />l 5.~1.)ES POTENTIALLY SIGNIFICANT LESS THAN NO <br /> SIGNIFICANT UNLESS SIGNIFICANT IMPACT SOURCES <br /> ISSUES MITIGATION IMPACT <br /> INCORPORATED <br />EXPLANATION: The East 14 Street Corridor is presently designated as "Corridor-Mixed Use" in the Land Use Plan. The intent <br />of the Development Strategy is to implement the Corridor-Mixed Use designation by allowing more compact mixed use <br />development including multiple family residential, commercial, office and appropriate civic-oriented uses. The Development <br />Strategy emphasizes mixed use development and is also encouraging more multiple-family residential development to help increase <br />the demand for a limited base of neighborhood-oriented commercial uses. Overall, the Development Strategy recommends more <br />residential uses, but less commercial development than what the General Plan EIR Traffic Analysis examined. This results in less <br />total vehicle trips within the Comdor and maintains all acceptable LOS standards than what the General Plan EIR anticipated at full <br />buildout. <br />Overall Growth and Anticipated Traffic -The General Plan examined approximately 460,000 sf of commercial development and up <br />to 454 housing units at buildout. The Development Strategy is consistent with the General Plan "Corridor-Mixed Use" land use <br />designation by encouraging mixed use developments, with a stronger emphasis on multiple family residential uses. This emphasis is <br />needed to respond to market analysis that shows weak demand for additional commercial uses. By encouraging more residential <br />uses, the demand for more neighborhood-serving commercial uses will increase, The strategy to integrate increased residential <br />development into the Corridor also implements other General Plan policies to create a more lively pedestrian environrrlent. <br />The General Plan EIR concluded that all signalized intersections within the East 14~' Street Corridor would operate under acceptable <br />conditions under build-out conditions. The traffic analysis prepared for the Development Strategy concludes that "the level of <br />development proposed by the Development Strategy is expected to result in fewer vehicle trips than what. was evaluated by the <br />General Plan, since the Development Strategy recommends a greater level of residential development, and reduced commercial <br />development, than was considered during the General Plan analysis." Hence, the Development Strategy will, not exceed anticipated <br />levels of traffic anticipated by the General Plan EIR and-will not create any impacts to the roadway system The following table <br />snmmari~es the differences in anticipated number of vehicle trips between the Development Strategy and General Plan (Please see <br />discussion in Draft Development Strategy Section 4.4.1 and Appendix 4: Trip Generation Comparison). <br /> Develo ment Strate !General Plan <br />Time of Trip <br />Total Trips (Build Out) AM <br />751 PM <br />1,175 Daily _ AM <br />12,201 ~ 1,464 PM <br />1,430 Daily <br />22,771 <br />of General Plan 51 % 82% 54%; <br />Proposed Sheetscape Improvement Concepts -The Development Strategy calls for a number of streetscape improvements to create <br />a safer environment for pedestrians and vehicles. The Strategy outlines concepts for a number of improvements including revised <br />cross-sections, sidewalk improvements, installation of bulb-outs and new crosswalks. The Development Strategy has been reviewed <br />by CalTrans to ensure that the proposed concepts meets State street design standards. As individual streetscape improvement <br />projects are implemented, continued coordination with CalTrans will occur as part of separate CEQA review for each project. <br />Parking Strategies - To entice new development, the Development Strategy proposes to reduce parking ratios for a variety of uses. <br />Ta address concerns about providing adequate parking the Development Strategy includes additional policies that call for <br />considering 1) shared parking facilities, 2) create new residential permit parking areas, 3) incorporate the latest parking technologies <br />such as parking lift systems for commercial and esidential developments, 4) use of the CarShare program, 5) create new municipal <br />parking lots at key locations to support new development, and 6) encourage developers and employers to provide transit passes to <br />residents and workers. Collectively, these strategies will help reduce the use of vehicles and make better use of existing transit <br />options. <br />Emergency Access -The Alameda County Fire Department has provided prelinunary comments on the proposed Draft Development <br />Strategy, specifically related to the proposed streetscape improvements. Comments included concerns related to adequate spacing to <br />acGOmmodate emergency vehicle within proposed landscaped medians and other facilities related to AC Transit's proposed Bus <br />Rapid Transit facilities. Additional comments were provided that relate to providing adequate turn movements within intersections <br />that will contain proposed bulb-outs. As the streetscape improvements are proposed at specific locations, continued coordination <br />with the Fire Department and Caltrans will ensure that adequate intersection geometries and median facility spacing is provided to <br />address emergency vehicle access and circulation. <br />Sources: San Leandro General Plan EIR - Chapt. 3 Land Use; Draft East 14`x' Street South Area Development Strategy (Section <br />4.4.1); East 14 Sheet Background Report -Appendix 4: Trip Generation Comparison; Institute of Traffic Engineers -Trip <br />Generation Rates <br />~nitlal Studv and T(aon7iva Tlo~l.,..,u.,., <br />
The URL can be used to link to this page
Your browser does not support the video tag.