Legal Analysis <br />From a legal perspective, the matter is a simple collection issue. Since ABAG POWER did <br />not enter into a contract during the Gap Period, there is no "seller" to invoice ABAG POWER <br />for any energy that was consumed. There are only two sources of electricity flowing into <br />the California grid that could have serviced the Electric Program during the Gap Period; the <br />ISO and PG&E. <br />The energy consumed by the Members could have been supplied through the ISO <br />"imbalance energy." This is a reserve maintained by the ISO when contracted for energy <br />supplies from PG&E and other electric service providers fall below the amount necessary to <br />keep the grid operational. Electricity Program electricity consumption during the Gap <br />Period could have come from this source. <br />Alternatively, PG&E supplies such a large amount of electricity over any period of time that <br />it could have been supplying part of the power for the Electric Program during the Gap <br />Period. <br />The risk of incurring the liability is wholly dependent on the ability either of the ISO or of <br />PG&E to "prove" that electricity consumed by Members during this period was supplied by <br />the party making the claim. <br />ABAG POWER is without sufficient information to evaluate the likelihood of this risk <br />occurring. . <br />ABAG POWER has reviewed the price of imbalance energy for the period in question. <br />Imbalance energy prices tend to be the highest of all prices paid for electricity. Based on the <br />price for imbalance energy an estimate of the amount of electricity that the Electric Program <br />would have consumed during the Gap Period, the maximum exposure is estimated as One <br />Million Four Hundred Twenty Thousand Dollars ($1,420,000). <br />Finally, ABAG POWER notes that as time goes on the ability of either the I50 or PG&E to <br />collect the data necessary to generate an invoice and prove a claim diminishes. <br />B. UDC CHARGES <br />Description of Risk <br />From information provided by the Program's billing agent (APS) we believe there may be <br />UDC charges for which neither ABAG POWER nor its Members have been invoiced by PG&E. <br />During the period July 2000 to June 2001 the amount of UDC charges billed to members <br />(and collected by ABAG POWER) is greater than the amount invoiced from PG&E. <br />ABAG POWER is also aware of one instance in which UDC charges for the affected period <br />were generated by PG&E in connection with an electric account for a Member's streetlight <br />system. These accounts are unique in the PG&E billing system. Electricity consumed by a <br />streetlight system is not metered and is charged on an estimated consumption basis. In the <br />case of which ABAG POWER is aware, the Member had already paid PG&E for the asserted <br />UDC charges. <br />Wind Up Agreement-Attmt D- 4-2$-04 All <br />