My WebLink
|
Help
|
About
|
Sign Out
Home
Agmt 2004 Freyer & Laureta Inc
CityHall
>
City Clerk
>
City Council
>
Agreements
>
2004
>
Agmt 2004 Freyer & Laureta Inc
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/12/2009 3:15:08 PM
Creation date
8/11/2009 10:58:01 AM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Agreement
Document Date (6)
11/15/2004
Retention
PERM
Document Relationships
Reso 2004-168
(Approved by)
Path:
\City Clerk\City Council\Resolutions\2004
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
The CAD files will be saved in AutoCAD 2000 format. The City <br />will receive three sets of the 70% plans that will include Cover <br />Sheet, Plan and Profile Sheets of project areas, and Detail Sheets. <br />70% Specifications -Consultant shall prepare 70% Specifications. <br />The Specifications will be prepared in City's standard format using <br />MS Word, and in accordance with the Standard Specifications for <br />Public Works Construction, (The Green Book, latest edition). <br />• 70% Cost Estimate -Consultant shall prepare a 70% cost estimate <br />with an estimated cost of construction broken down into standard <br />bid items for all elements shown on the 70% Plans. <br />70% Review Meetings -Consultant shall attend up to two <br />meetings, one to present and discuss the 70% design and the <br />second to discuss City's comments and schedule. <br />A-2.5.2 Phase II - 100% Design <br />100% Plans -Consultant shall prepare 100% Plans incorporating <br />City comments and final design elements. The City will receive 3 <br />sets of the 100% plans. <br />• 100% Specifications -Consultant shall prepare 100% <br />Specifications. The Specifications will be prepared in City's <br />standard format using MS Word, and in accordance with the <br />Standard Specifications for Public Works Construction, (The <br />Green Book). <br />• 100% Cost Estimate -Consultant shall prepare a 100% cost <br />estimate with an estimated cost of construction broken down into <br />standard bid items for all elements shown on the 100% Plans. <br />Review Meetings -Consultant shall attend up to two meetings, <br />one to present and discuss the 100% design and the second to <br />discuss final City comments and schedule. <br />A-2.5.3 Phase III -Final Design <br />Final Plans - Consultant shall prepare Final Plans incorporating <br />City comments from the 100% review. All sheets shall be <br />prepared in accordance with the City's drafting standards and will <br />be on City's standard borders supplemented by our drafting <br />standards and standard details, symbols, and abbreviations as <br />appropriate. The CAD files will be saved in AutoCAD 2000 <br />Sanitary Sewer Pipeline Replacements 04-OS October 19, 2004 <br />OS-593-52-211 Page 17 of 22 <br />
The URL can be used to link to this page
Your browser does not support the video tag.