My WebLink
|
Help
|
About
|
Sign Out
Home
Agmt 2004 Mark Thomas & Company Inc
CityHall
>
City Clerk
>
City Council
>
Agreements
>
2004
>
Agmt 2004 Mark Thomas & Company Inc
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/12/2009 1:03:40 PM
Creation date
8/12/2009 1:03:39 PM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Agreement
Document Date (6)
7/19/2004
Retention
PERM
Document Relationships
Reso 2004-119
(Approved by)
Path:
\City Clerk\City Council\Resolutions\2004
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
26
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Trail alignment and profile <br />Location of existing utilities and identification of utilities requiring relocation <br />Pedestrian bridge design details <br />City shall forward one- set of 70% plans and structural calculations to the Building Department <br />for approval. Contractor shall respond to Building Department review comments: <br />DELIVERABLES <br />Five hard copies and one electronic copy o£ <br />• Cover Sheet <br />• Plan/Profile at 1" = 40' scale (2) <br />• Civil Details (15) <br />• Structural Sheets (6) <br />• Structure design calculations <br />TOTAL ESTIMATED NUMBER OF SHEETS: 24 Sheets <br />The City shall provide an electronic, English version of the standard details for use in the <br />construction documents. Other jurisdictional standard details shall be added to the appendix <br />of the specifications or shall be included on the special detail drawings. <br />Task 3.2 -100% Submittal <br />After receiving comments from the City on the 70% submittal, Consultant shall begin the <br />preparation of the 100% submittal of the construction documents (in English units). <br />Engineering services for this task shall include completion of the construction documents <br />with plans, technical specifications and quantity calculations and cost estimates. Consultant <br />shall continue to coordinate project design issues with interested agencies and utility <br />companies <br />This submittal shall be effectively a complete PS&E set and shall include the following list <br />of drawings. Estimated number of drawing is shown in parenthesis. <br />DELIVERABLES: <br />Five hard copies and one electronic copy of: <br />• Cover Sheet <br />• Plan/Profile at 1" = 40' scale (2) <br />• Civil Details (15) <br />• Structural Sheets (6) <br />• Structure design calculations <br />-- <br />Bay Trail Slough Bridge July 19, 2004 <br />Project No. 144-39-012 Page 19 of 26 <br />
The URL can be used to link to this page
Your browser does not support the video tag.