Laserfiche WebLink
Trail alignment and profile <br />Location of existing utilities and identification of utilities requiring relocation <br />Pedestrian bridge design details <br />City shall forward one- set of 70% plans and structural calculations to the Building Department <br />for approval. Contractor shall respond to Building Department review comments: <br />DELIVERABLES <br />Five hard copies and one electronic copy o£ <br />• Cover Sheet <br />• Plan/Profile at 1" = 40' scale (2) <br />• Civil Details (15) <br />• Structural Sheets (6) <br />• Structure design calculations <br />TOTAL ESTIMATED NUMBER OF SHEETS: 24 Sheets <br />The City shall provide an electronic, English version of the standard details for use in the <br />construction documents. Other jurisdictional standard details shall be added to the appendix <br />of the specifications or shall be included on the special detail drawings. <br />Task 3.2 -100% Submittal <br />After receiving comments from the City on the 70% submittal, Consultant shall begin the <br />preparation of the 100% submittal of the construction documents (in English units). <br />Engineering services for this task shall include completion of the construction documents <br />with plans, technical specifications and quantity calculations and cost estimates. Consultant <br />shall continue to coordinate project design issues with interested agencies and utility <br />companies <br />This submittal shall be effectively a complete PS&E set and shall include the following list <br />of drawings. Estimated number of drawing is shown in parenthesis. <br />DELIVERABLES: <br />Five hard copies and one electronic copy of: <br />• Cover Sheet <br />• Plan/Profile at 1" = 40' scale (2) <br />• Civil Details (15) <br />• Structural Sheets (6) <br />• Structure design calculations <br />-- <br />Bay Trail Slough Bridge July 19, 2004 <br />Project No. 144-39-012 Page 19 of 26 <br />