My WebLink
|
Help
|
About
|
Sign Out
Home
Agmt 2003 Callander Associates Inc
CityHall
>
City Clerk
>
City Council
>
Agreements
>
2003
>
Agmt 2003 Callander Associates Inc
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/20/2009 3:27:28 PM
Creation date
8/14/2009 9:02:28 AM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Agreement
Document Date (6)
3/17/2003
Retention
PERM
Document Relationships
Reso 2003-076
(Approved by)
Path:
\City Clerk\City Council\Resolutions\2003
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EXHIBIT A <br />SCOPE OF SERVICES <br />Project involves replacing the existing playground areas at McCartney Park with new facilities <br />that meet current CPSC and ADA requirements; as well as other ancillary improvements to site <br />furnishing, flatwork, landscaping, drainage and irrigation. <br />3.0 CONSTRUCTION DOCUMENTS <br />3.01 Format of Deliverables: All submittals described below shall conform to the following: <br />• All drawings shall be made available to the City of San Leandro in AutoCad2000 format. <br />(24x36 size on city standard title block) <br />• Specifications shall be prepared in Microsoft Word 2000 utilizing the APWA standard <br />specifications (The Green Book), 2003 edition. (8.5x11 size} <br />• Details shall conform to the City of San Leandro Standard Plans where applicable, and all <br />referenced details shall be included on drawings. <br />3.02 35% Submittal: Prepare five copies of 35% complete construction documents with <br />layout of all major elements clearly defined. The specific drawing index will likely <br />include the following: <br />• cover sheet <br />• graduig and drainage plan <br />• site construction plan <br />• playground. area enlargement plan and details <br />• lighting plan <br />• detail drawings for all of the above <br />« irrigation plan and details <br />• plantnig plan and details <br />• outline of technical specifications <br />• estimate of probable construction costs <br />Submit above to City staff for review and comment; conduct joint meeting with City <br />departments to facilitate review. <br />3.03 70% and 100% Submittals: Prepare 5 copies of separate 70% and 100% submittal <br />packages of construction documents incorporating comments received on design <br />development submittal, along with an estimate of probable construction cost in bid form <br />format. <br />3.04 Staff Meeting: Allow for one staff meeting at the 70% submittal and another at the 100% <br />submittal similar to task 2.04. <br />CSA-Callander Associates Page 3 of 14 <br />IvlcCartney Park Project Nos. 210-69-198, 210-b9-199 <br />
The URL can be used to link to this page
Your browser does not support the video tag.