My WebLink
|
Help
|
About
|
Sign Out
Home
Agmt 2003 Callander Associates Inc
CityHall
>
City Clerk
>
City Council
>
Agreements
>
2003
>
Agmt 2003 Callander Associates Inc
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/20/2009 3:27:28 PM
Creation date
8/14/2009 9:02:28 AM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Agreement
Document Date (6)
3/17/2003
Retention
PERM
Document Relationships
Reso 2003-076
(Approved by)
Path:
\City Clerk\City Council\Resolutions\2003
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
3.05 Final Plans, Specifications and Estimate: Provide City with one hard copy of plans, <br />specifications, and cost opinion. Drawings to be vellum, signed and stamped by all <br />consultants as applicable. Also include one electronic copy of the final documents for <br />City's use in bidding. <br />4.0 CONSTRUCTION ADMINISTRATION <br />4.01 Construction Review: Provide construction support services to the City in monitoring <br />the contractors' execution of the work for conformance with design intents, contract <br />requirements, schedules, and cost limits. Work shall be performed on an hourly basis <br />based on pre-approval by the City. City shall have the primary responsibility for this <br />phase of services and shall be the primary point of contact. Services may include the <br />following: <br />a. Respond to contractor requests for information (RFPs) <br />b. Review contractor submittals <br />c. Perform site inspections as requested by the City of San Leandro <br />d. Assistance in evaluating contractor change order requests. <br />5.0 SCHEUDLE <br />5.01 Schedule: Schedule for completed of project deliverables is as follows: <br />Submit 35% drawings, outlined specifications 3 weeks from Notice to Proceed <br />and Cost Estimate <br />Submit 70% Construction Documents <br />and Cost Estimate <br />3 weeks from receipt of <br />City's comments on 35% PS&E <br />Submit 100% Construction Documents <br />and Cost Estimate <br />Submit Final Construction Documents <br />and Cost Estimate <br />CITY TASKS: <br />• Provide City standard title block. <br />• Provide City standard details. <br />3 weeks from receipt of <br />City's comments on 70% PS&E <br />2 weeks from receipt of <br />City's comments on 100% PS&E <br />• Provide topographic survey. <br />• Review 35% design development set, and provide comments. <br />• Review 70% construction document set, and provide comments. <br />• Review 100% construction document set, and provide comments. <br />• Route construction documents sets to appropriate City personnel for review. <br />CSA-Callander Associates Page 4 of 14 <br />McCartney Park Project Nos. 210-69-198, 210-69-199 <br />
The URL can be used to link to this page
Your browser does not support the video tag.