My WebLink
|
Help
|
About
|
Sign Out
Home
Agmt 2003 Group 4 Architecture
CityHall
>
City Clerk
>
City Council
>
Agreements
>
2003
>
Agmt 2003 Group 4 Architecture
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/14/2009 9:39:38 AM
Creation date
8/14/2009 9:39:36 AM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Agreement
Document Date (6)
3/17/2003
Retention
PERM
Document Relationships
Reso 2003-078
(Approved by)
Path:
\City Clerk\City Council\Resolutions\2003
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
39
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2.3.6.6 The Consultant shall coordinate consultant work. <br />2.3.6.7 The Consultant shall conduct document quality control review. <br />2.3.6.8 The Consultant shall distribute 70% Construction Documents submittal. <br />2.3.7 100% Construction Documents <br />2.3.7.1 The Consultant shall distribute 70% City-review comments to project team and respond <br />to City-review comments. <br />2.3.7.2 The Consultant shall update project controls. <br />2.3.7.3 The Consultant shall complete technical specifications. <br />2.3.7.4 The Consultant shall update interior fmishes, schedules, details. <br />2.3.7.5 The Consultant shall prepare floor plans, equipment, details. <br />2.3.7.6 The Consultant shall update cost estimate. <br />2.3.7.7 The Consultant shall coordinate consultants and conduct a quality control review. <br />2.3.7.8 The Consultant shall distribute 100% Construction Documents submittal. <br />2.3.7.9 The Consultant shall conduct one final presentation to the City. <br />2.3.7.10 The Consultant shall prepare a Construction Document submittal for the Office of <br />Library Construction that meets their submittal requirements. <br />2.3.8 Final Construction Documents <br />2.3.8.1 The Consultant shall distribute City-review comments to project team and respond to <br />City-review comments. <br />2.3.8.2 The Consultant shall prepare written responses to the Office of Library Construction <br />review comments. <br />2.3.8.3 The Consultant shall update project controls <br />2.3.8.4 The Consultant shall revise documents per review comments. <br />2.3.8.5 The Consultant shall assist the City with the City's responsibilities to obtain approvals <br />from applicable agencies_ <br />2.3.8.6 The Consultant shall submit for plan check review. <br />2.3.8.7 The Consultant shall revise documents per City plan check comments. <br />2.3.8.8 The Consultant shall submit for City backcheck. <br />2.3.9 The Consultant shall assist the City in the preparation of the necessary bidding information, <br />bidding forms, the Conditions of the Contract, and the form of Agreement between the City <br />and the Contractor. <br />2.3.10 The Consultant shall advise the City of any adjustment to previous Statements of Probable <br />Construction Costs indicated by changes in requirements or general market conditions. <br />2.3.11 The Consultant shall assist the City in connection with the City's responsibility for filing <br />documents required for the approval of governmental authorities having jurisdiction over the <br />Project. <br />Meetings: Four Meetings with PMT <br />Deliverables: Construction Drawings and Specifications; 70%, 100% and final <br />Construction Documents, Specifications, and cost estimate and updated Statement of <br />Probable Construction Cost <br />2.4 BIDDING PHASE <br />Washington Manor Branch Library Page 5 of 22 <br />Group 4 Architecture CSA <br />
The URL can be used to link to this page
Your browser does not support the video tag.