My WebLink
|
Help
|
About
|
Sign Out
Home
Agmt 2003 Material Integrity Solutions
CityHall
>
City Clerk
>
City Council
>
Agreements
>
2003
>
Agmt 2003 Material Integrity Solutions
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/14/2009 11:38:46 AM
Creation date
8/14/2009 11:38:45 AM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Agreement
Document Date (6)
4/7/2003
Retention
PERM
Document Relationships
Reso 2003-098
(Approved by)
Path:
\City Clerk\City Council\Resolutions\2003
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EXHIBIT A-] <br />DETAILS OF DESIGN <br />Design shall be done in accordance with accepted and published engineering principals. <br />The scope of this contract includes all architecture and engineering service required to complete <br />the work. No work shown on the plans or listed in the specifications shall be `design build' <br />unless it is specifically listed herein, or approved in writing by the City. <br />Unique, proprietary, or experimental designs and materials are prohibited. <br />Specification shall be `Greenbook' format. In accordance with the standard specifications for <br />public works construction, ?003 edition. Front-end specifications (part 1) shall be prepared by <br />the City. Contractor shall prepare all other specifications. Contractor shall coordinate the work <br />with the front end specifications prepared by the City. Contractor shall provide bid item list. <br />Performance specifications are prohibited. Specifications shall be coordinated with the plans. <br />Specifications shall be edited such that only materials, procedures, and execution specific to this <br />project are included. <br />Materia] fntegrit~~ Solutions/CSA Page 5 of 17 <br />Pipe Modernization WFCP Project No. 593-52-202 <br />
The URL can be used to link to this page
Your browser does not support the video tag.