My WebLink
|
Help
|
About
|
Sign Out
Home
Agmt 2003 BKF Engineers (2)
CityHall
>
City Clerk
>
City Council
>
Agreements
>
2003
>
Agmt 2003 BKF Engineers (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/18/2009 10:03:06 AM
Creation date
8/18/2009 10:03:05 AM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Agreement
Document Date (6)
7/21/2003
Retention
PERM
Document Relationships
Reso 2003-173
(Approved by)
Path:
\City Clerk\City Council\Resolutions\2003
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
23
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
using City of San Leandro standard boilerplate and Standard Specifications as <br />appropriate. Specifications will be developed for each item of work. Contractor will <br />prepare a cost estimate for the project based on the plan set. Included is striping <br />improvement design at the Foothill/MacArthur intersection coordinated with <br />Caltrans. <br />Specific tasks to be performed during this phase will include: <br />• Incorporate comments from City <br />• Develop site improvement plan for each block of the improvement area <br />• Conduct meetings with design team for project review <br />• Develop basic block improvement plan design and detail preparation <br />• Street improvement, grading design and detail preparation <br />• Storm drainage detail design <br />• Develop landscape and irrigation plan <br />• Develop lighting and electrical plan <br />• Prepare specifications <br />• Prepare preliminary cost estimate and drawings submittal for review <br />• Three design team meetings with City <br />• 'Three meetings with City and Caltrans <br />Deliverables <br />Deliverables will consist of eight (8) sets of full size 70% plans and specification <br />documents as well as a preliminary cost estimate for the project. Lighting level <br />diagrams will be prepared. Outline specifications will be provided for major <br />construction elements. <br />Schedule <br />70% Plans, Specifications and Estimates 11 weeks from receipt of Notice to <br />Proceed <br />See attached schedule (Exhibit A-1) for breakdown <br />Task 3 95°l° Plans, Specifications and Estimates: Contractor will essentially be <br />completing the project plan and specification sets at this stage of the project. The <br />plans will be ready for final reviews. The final list of quantities will be prepared and <br />incorporated into the bid package. <br />Specific tasks to be performed. during this phase will include: <br />• Incorporate comments from City <br />• Finalize site improvement plan for each block of the improvement area <br />• Finalize street improvement, grading design and detail preparation <br />• Finalize hardscape and softscape plans <br />• Finalize storm drainage detail design <br />• Complete specification package <br />CSA-BKF MacArthur Streetscape Page 4 of 23 <br />Revised 5/02 <br />
The URL can be used to link to this page
Your browser does not support the video tag.