My WebLink
|
Help
|
About
|
Sign Out
Home
Agmt 2003 BKF Engineers (3)
CityHall
>
City Clerk
>
City Council
>
Agreements
>
2003
>
Agmt 2003 BKF Engineers (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/18/2009 2:41:50 PM
Creation date
8/18/2009 2:41:48 PM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Agreement
Document Date (6)
10/6/2003
Retention
PERM
Document Relationships
Reso 2003-204
(Approved by)
Path:
\City Clerk\City Council\Resolutions\2003
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
28
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Task 5.3 -Finalize Right of Way <br />Contractor shall incorporate Draft PSR comments on the Right of Way Checklists and <br />ISA. Contractor shall review and verify the right of way requirements for each <br />alternative. Contractor shall finalize a Right of Way Checklist for each alternative in <br />accordance with the requirements for a Caltrans PSR. Contractor shall finalize the ISA. <br />Task 5.4 -Finalize Project Study Report <br />Contractor shall update the Draft PSR towards finalizing the PSR. Contractor shall <br />modify and review the PSR narrative, exhibits and attachments. <br />Task 5.5 -Finalize Quantities and Cost Estimate <br />Contractor shall update quantities and cost estimates in accordance with comment <br />incorporation and revisions to the geometric alternatives. Contractor shall establish final <br />quantities and cost estimate for each geometric alternative. <br />Task 5.6 - In-house Quality Control <br />Contractor shall perform an independent quality control review of the PSR. The review <br />shall include work performed by other members of the design team. Contractor shall <br />incorporate comments produced from the independent quality control review prior to the <br />Final PSR submittal as described under Task 5.7. <br />Task 5.7 -Final Project Study Report <br />Contractor shall assemble the Final PSR for City and Caltrans signature. Contractor shall <br />provide City with six (6) sets and Caltrans a maximum of twenty (20) sets of the Final <br />Project Study Report. <br />Task 5 Deliverables <br />Final PSR <br />Final ISA <br />Additional Services <br />Other items of work not described above may be added to the scope of work with an <br />approved work authorization and budget from the City. <br />Contractual Services Agreement/BKF Engineers Page 9 of 28 <br />Revised 5-02 <br />
The URL can be used to link to this page
Your browser does not support the video tag.