My WebLink
|
Help
|
About
|
Sign Out
Home
Agmt 2003 BKF Engineers (3)
CityHall
>
City Clerk
>
City Council
>
Agreements
>
2003
>
Agmt 2003 BKF Engineers (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/18/2009 2:41:50 PM
Creation date
8/18/2009 2:41:48 PM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Agreement
Document Date (6)
10/6/2003
Retention
PERM
Document Relationships
Reso 2003-204
(Approved by)
Path:
\City Clerk\City Council\Resolutions\2003
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
28
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Contractor shall document the comment resolutions with meeting minutes. The meeting <br />minutes shall be distributed to the City and Caltrans. <br />Task 4.7 - In-house Quality Control <br />Contractor shall perform an independent quality control review of the Draft PSR. The <br />review shall include work performed by other members of the design team. Contractor <br />shall incorporate comments produced from the independent quality control review prior <br />to the Draft PSR Submittal as described under Task 4.8. <br />Task 4.8 -Draft Project Study Report (PSR) Submittal <br />Contractor shall prepare and assemble the Draft PSR for City and Caltrans review. <br />Contractor shall submit required copies of the Draft PSR for the City and Caltrans. <br />Task 4 Deliverables <br />Initial Site Assessment <br />Right of Way Checklist <br />Cost Estimate <br />Design Exceptions Listing <br />PSR Administrative Draft <br />Comment Resolution Meeting Minutes <br />Draft PSR <br />Task 5: Final Project Study Report (PSR) Submittal <br />Contractor shall prepare the Project PSR for signature and Caltrans approval. The PSR <br />shall be complete and be in compliance with Caltrans Project Development Procedures <br />Manual. <br />Task 5.1-Draft PSR Comment Review <br />Contractor shall compile and distribute the Draft PSR review comments to Project design <br />team. Contractor shall review comments and determine conflicts. Review conflicts and <br />clarifications will be summarized and presented to the City. Contractor shall incorporate <br />Draft PSR comments to PSR. <br />Task 5.2 -Finalize Geometric Alternatives <br />Contractor shall modify the geometric alternatives in accordance with the Draft PSR <br />comments. The three (3) geometric alternatives shall be finalized for PSR evaluation. <br />Contractual Services AgreementlBKF Engineers Page 8 of 28 <br />Revised 5-02 <br />
The URL can be used to link to this page
Your browser does not support the video tag.