4.8 Design Management <br />Contractor shall provide overall project management and maintain effective <br />communications with the City project staff. With each monthly invoice, Contractor shall <br />provide a project status report that outlines work completed and budget expenditures, as <br />well as an updated project schedule. <br />Deliverables: Monthly Status Reports <br />5.0 CONSTRUCTION DOCUMENTS / 70% DESIGN <br />5.1 Design <br />Contractor shall prepare 70% complete construction documents for the project. The <br />layout sheets shall show the utilities and improvement in screened background for <br />coordination purposes. Draft specification shall be provided. Estimates of probable <br />construction costs shall be provided with the work defined by same component areas <br />utilized in 30% Submittal. The plans to be prepared during 70% Design are: <br />East 14th Street Improvements: <br />G-1 Title Sheet <br />G-2 Key Map /General Notes /Survey Control Diagram <br />G-3 Legend/Abbreviations <br />D-1 Demolition Plan E 14t'' Intersections (1"=20`) <br />D-~ Demolition Plan E 14th Intersections (1"=20') <br />C-1 Typical Sections <br />C-4 Details E 14th Intersections <br />E-1 Street Lighting Layout & Profiles <br />E-2 Street Lighting Layout & Profiles <br />E-3 Street Lighting Layout & Profiles <br />E-4 Street Lighting Layout & Profiles <br />E-5 Street Lighting Vault Cover Details <br />E-6 Electrical single line diagram <br />E-7 Electrical Panel Boards <br />E-8 Electrical Panel Boards <br />E-9 Electrical Details <br />E-10 Electrical Details <br />L-1 Landscape Layout (1" = 20'H) E14th Intersections <br />L-2 Landscape Layout/Details (1" = 20'H) E14th Intersections <br />CSA-Winzler and Kelly Page 10 of 28 <br />Davis St/East 14`h St Lighting and Pedestrian Enhancements Project No. 962-83-062 <br />